Synchronous Bypass Valves for Hydroplants
The requirement that synchronous bypass valves be provided on most hydroplants and the high cost of suitable valves have created a demand for rebuilt valves. Recently, the Bureau of Reclamation...

Efficiency in Auxiliary Electrical Systems
In 1984, during the preliminary design for the proposed second powerhouse at the Corps of Engineers' McNary Dam on the Columbia River, the more recent improvements and techniques...

Influence of Surface Finish on Thrust Bearing Life
The original pivoted pad thrust bearing installed and fitted at the Holtwood Power Station in 1912 by A. Kingsbury has been operating continuously since that time without any difficulty....

What is Wrong with our Hydro Generators?
A number of studies have already been presented on the refurbishment and modernization of hydro facilities and also the design and upgrading of the generators. This paper will partly deal...

Damage Accumulation Models for Bridges
In the study summarized in this paper the serviceability and ultimate limit states were reviewed for concrete and steel girder bridges. A model is proposed to evaluate strength and remaining...

Bridge Repairs?Unexpected Effects on Reliability
There is a significant probability that a bridge will require repairs at some time during its service life. Repairs correcting one deficiency can cause other, unanticipated problems. Awareness...

Rehabilitation of Highway Bridges: Design and Operational Considerations
The design of a rehabilitation of a bridge which must maintain some lanes of traffic requires special consideration of construction procedures and traffic control, which are discussed...

The Role of Decision Rules on Structural Safety Evaluation Systems
Three steps are involved during an assessment procedure. The first step is to make a diagnosis for possible causes of the damage, the second is to perform a qualitative evaluation including...

Parameter Identification in Markov Damage Models
This paper is concerned with the identification of parameters in cumulative damage processes whose underlying statistics are Markov. We consider the problem of parameter estimation during...

Computer-Aided Wastewater Master Planning
Computerized wastewater collection system modeling is a tool now used by city planners and engineers to efficiently and accurately analyze present and future conditions. Once a model has...

Using the Microcomputer in the Software Development Process
The migration of the computer from the controlled environment of a computer room to the office desk-top provides the software engineer with a convenient and effective tool for enhancing...

Terrain Modelling for Computer-Aided Site Development
This research proposes a terrain model and a storm drainage model to be used as tools in creating a more efficient design/approval stage of the development process. This research proposes...

GWPATH: Ground-Water Flow Path Analysis
GWPATH is an interactive software package for estimating horizontal fluid pathlines and travel time in fully saturated groundwater flow domains. GWPATH was developed for the IBM PC-AT...

Least-Cost Scheduling of Advance Maintenance Dredging
New methods are suggested for scheduling advance maintenance dredging operations on isolated reaches of navigation channels. For reaches where siltation occurs regularly as a result of...

Getting to the Root of Sewer Problems
The ability to quantify and qualify work schedule in a clear, logical and precise manner can make the difference between an effective preventive maintenance program and one of 'trying'...

The Applicability of U.K. Sewerage Rehabilitation Techniques to the U.S.
The total length of public sewers in the UK is 160, 000 miles and in recent years there has been increasing concern over their conditions. Research spearheaded by the Water Research Centre...

Quality in the Constructed Project
A Guideline for Owners, Designers, and Constructors
This book provides guidelines and recommendations for owners, design professionals, and constructors on how to provide quality in constructed projects. Roles, responsibilities, and limits...

Crop Irrigation Requirement Model for Utah
Crop irrigation requirements vary greatly across Utah's wide range of climatic conditions. About 40 electronic weather stations have been established in areas representing...

Probabilistic Approach to Maintenance Scheduling
Maintenance has the purpose of prolonging the working life of equipment and of sustaining expected levels of performance and reliability. If equipment deterioration is construed as a probabilistic...

Probabilistic Maintenance Opportunities
The Bureau of Reclamation has instituted a number of operation and maintenance oversight activities to ensure that Reclamation and water-user operated projects are operated and maintained...

 

 

 

 

Return to search