Application of Appropriate Technology in Hydroelectric Project Rehabilitation
Many older dams are in need of rehabilitation as a result of aging, deterioration, and more stringent safety standards. A primary concern is spillway and stability inadequacies resulting...
Flood Control Design for Development on Alluvial Fans
Hydrology, debris production, sediment transport and hydraulic studies were conducted to provide flood control for a development within an alluvial fan floodplain. Innovative techniques...
Application of a Generalized Risk Dynamic Model to a Spillway Design Flood
Risk analysis can provide a logical basis for selecting the optimal design capacity of a flow conveyance hydraulic structure for the least total cost or specified non-exceeding risk levels....
McClure Park: A Multi-Purpose Off-Stream Storage Facility for Tulsa, Oklahoma
The City of Tulsa is in the process of implementing a flood control plan for the 61 square-mile (158 km2) Mingo Creek watershed. The federally-assisted...
Influence of Wetlands on Streamflow in Illinois
Streamflow records from 30 gaging stations in Illinois were analyzed to assess the influence of wetlands on streamflow. The objective of this research was to determine if streamflow parameters...
Reliability Assessment Method for Flood Forecasts
Peak discharge predictions produced by rainfall-runoff models and used by flood warning and preparedness agencies are subject to uncertainties in the input data, model parameters, and...
Routing for Lake and Tidal Canal Drainage System
A routing method is presented for lake and tidal canal interconnected drainage system in coastal urban areas. Combing reservoir routing, channel routing, and discharge computation of the...
Verification of WASURO Using the Puerto Nuevo Physical Model Study Results
The Jacksonville District, US Army Corps of Engineers, used the hydraulic design computer modeling program, WASURO, for preliminary design of the Rio Puerto Nuevo Flood Control System....
Detention Basin Design to Control Flood Volumes
A desk-top method is presented for hydraulic design of detention basins. The main objective is to control the flood volume rather than the peak discharge. The method is based on the pre-determined...
Channel Routing Effects on Unit Hydrograph Shape
Channel routing effects on hydrograph shape and the interpretation of downstream unit hydrographs are examined. A new dimensionless routing parameter is presented....
Sedimentation Aspects of Floodplain Management
This paper presents sedimentation aspects of a recent disastrous flood that occurred during September 10-12 1990 in the Han River basin, a central part of the Korean peninsula. The flood...
Yazoo River Basin a New Direction for the Corps
The paper presents the lessons learned from the past events in the Yazoo Basin. The Yazoo Basin project is the only mechanism available that can provide the flood control that is needed...
Marina Del Rey: 30 Years of Environmental Impact
Marina del Rey - the world's largest man-made recreational boating harbor - also holds primacy in pollution. Marina del Rey is home port to more than 6,100 vessels in wet...
Joint Occurrence of High Tide and Storm Surge in California
High tides or high storm surges separately generally do not pose a hazard for flooding or structural damage in California. However, when storms and periods of high tides coincide, the...
Rethinking Flood Control Channel Design
Until recently, the standard method of flood control was channelization�converting a natural stream to a uniform channel cross section. But this single objective approach is coming under...
Probable Maximum Floods at the Yucca Mountain Exploratory Shafts
This paper presents an analysis of flood flows in the Coyote Wash at the proposed high level nuclear waste repository site at Yucca Mountain, Nevada. Estimates of the hydrographs at various...
Creatively Cost Sharing a Large Flood Control Dam
The passage of Public Law 99-662 in November of 1986, commonly known as the Water Resources Development Act of 1986, added a new dimension to Federal development of water resource projects....
Capital Improvements Financing and Planning After a Natural Disaster
The Pima County Wastewater Department (PCWWMD) provides collection, treatment and disposal of wastewater in metropolitan Tucson, Arizona, and various outlying areas. In October 1983, severe...
Lake Zephyr Watershed Stormwater Management Plan
Zephyr Creek, located near the City of Zephyrhills in west-central Florida, annually experiences flooding caused by rainfall. Development has encroached into the floodplain causing homes,...
Hydrology Review for Corps 404 Permit Process
Since 1985 the Corps of Engineers has reviewed Section 404 permit requests in regard to hydrology and hydraulic impacts of developments in the mainstem floodplains of the Trinity River...