The Design and Construction of the Bartletts Ferry Labyrinth Weir Spillway
The discharge capacity of the Bartletts Ferry Project has been increased 165 percent by the addition of a labyrinth weir spillway. The hydraulic design was based on a published design...

Numerical Modeling of Downstream Impacts Resulting from Hydropower Operations
Hydropower peaking operations often have downstream impacts that require an accurate assessment. A one-dimensional implicit finite difference numerical model has been used to accurately...

Local Scour at Fish Rocks
There is a growing interest in the enhancement of rearing habitat for juvenile anadromous fish in the Pacific Northwest. This has focused attention on the need for a better understanding...

Willamette River Adjustments to New Spur Dikes
Severe bank erosion has caused recent local losses of up to 30 ft (9 m) per year of prime agricultural land along a half-mile (800 m) reach of the Willamette River, Oregon. The U. S. Army...

Intake-Shoaling and Pump-Vibration Problems
Iowa Generation's Council Bluffs Unit 3 circulating water-intake structure has experienced two major problems: (1) formation of sand bars in front of the trash racks during...

Design Accuracy of Stormwater Detention Basins
While the stormwater detention basin is the most frequently used method for controlling runoff from developing areas in the United States, there appears to be no statement of the probable...

Evaluation of Two-Stage Outlet Hydraulics
A two-stage detention basin is an effective storm water management tool. This type of basin is designed to control two storm events and it will tend to perform better than a single-stage...

Reservoir System Management for Water Quality
A reservoir system analysis computer model has been recently developed with the capability to simulate up to 10 reservoirs, 30 control points and 8 water quality parameters. With this...

Hydrology for River Management: The Belle River
Crop damages in recent years prompted farmers to back an effort to clean portions of a large inter-county drain. Other groups with conflicting interests pressed for a study of the impact...

Discharge Characteristics of Labyrinth Weirs
The hydraulic performance of labyrinth weirs is developed from data obtained from flume studies and site specific models. Using dimensional analysis, an equation for the discharge is developed...

Modeling Aeration Devices for Glen Canyon Dam
The 41-ft (12. 5-m) diameter tunnel spillways at Glen Canyon Dam experienced major damage during the 1983 spring runoff. This damage was initiated by cavitation. Hydraulic model studies...

Cavitation Inception from Cylindrical Holes
The inception of cavitation due to circular holes in a boundary is studied. Laboratory experiments were conducted to define limited cavitation as a function of the hole depth to diameter...

Aeration is the Solution for Sluice Cavitation Damage at Libby Dam, Montana
Cavitation has severely damaged two of the high-head flood control sluices. The damaged areas were immediately patched; however, these patches were not considered a solution to the problem....

Laboratory Studies of Cavitation in Corps of Engineers Hydraulic Structures
A selected bibliography of significant hydraulic laboratory research efforts by the U. S. Army Engineer Waterways Experiment Station to identify the likelihood of and means of preventing...

Movable-Bed Model Investigation of Littoral Drift on the Intake and Outlet of Lin-Kou Power Plant (I)
The establishment and operation of a distorted movable-bed model of the cooling water intake and outlet is described. The model employed is a three-dimensional movable-bed Froude model...

Prediction of Dam Overtopping Due to Mudflows
The eruption of Mount St. Helens on May 18, 1980 resulted in a small mudflow into Swift reservoir, which is located immediately south of the mountain. An engineering/geologic study was...

Modeling of a Multifunctional Hydraulic Structure
A 1:12 scale Froude model of a hydraulic control structure in the Rochester Combined Sewer Overflow Abatement Program (RCSOAP) was constructed and tested to optimize the design requirements...

Physical Hydraulic Modeling for a Small Hydroelectric Redevelopment
In the development of a small hydroelectric project, the operating head on the plant is usually limited. On these projects, the need to minimize head losses and eliminating other factors...

Streamflow Measurement and Analysis for Northwest Rangelands
Watershed hydrologic and sedimentation investigations on the Reynolds Creek Experimental Watershed in southwest Idaho were initiated in 1960. Major objectives of the watershed research...

CN Approach to Water Budgets for Small Watersheds
In some states, issuance of a surface mining permit is dependent upon an assessment of the current hydrologic baseline of the area to be mined and of the probable future impacts of mining...

 

 

 

 