The Design and Construction of the Bartletts Ferry Labyrinth Weir Spillway

by Marvin C. Jr. Meeks, Georgia Power Co, Power Supply, Engineering & Services Dep, Atlanta, GA, USA,



Document Type: Proceeding Paper

Part of: Water for Resource Development

Abstract:

The discharge capacity of the Bartletts Ferry Project has been increased 165 percent by the addition of a labyrinth weir spillway. The hydraulic design was based on a published design procedure which was modified by means of small scale hydraulic models. These model studies revealed the significance of the vertical aspect ratio as a critical design parameter. The structural design and various aspects of construction are briefly described.



Subject Headings: Hydraulic design | Hydraulic models | Structural design | Weirs | Spillways | Construction management | Water discharge

Services: Buy this book/Buy this article

 

Return to search