An Engineering Analysis of Sedimentation in Tidal Inlets
The engineering comparative analysis of deposition and scour of noncohesive sediments in the neighborhood of bridges over tidal inlets is a unique problem which does not lend itself conveniently...

Effect of Manning's Roughness Coefficient in Simulating Flow Parameters in Natural Channels
Manning's roughness coefficients are presented for three of the oldest and largest irrigation canals in Egypt. The discharges ranges from 35 to 318 m3/s....

Calibration of Beni-Mazar Movable Bed Model
A sand-bed model representing a reach of the Nile River was constructed to study alternative solutions to maintaining the navigation channel. Flume tests were carried out first to determine...

Numerical Modeling of Proposed Channel Designs (J. F. Baldwin III), California
Ship simulator studies of proposed improvements to navigable waterways are a very important part of any assessment. The John F. Baldwin Channel (JFB) Project (Phase III) is a ship channel...

Drought-related West Tennessee Channel Bank Failures
Massive bank failures occurred in 1988 along a 14-kilometer reach of the lower Obion River channel in Dyer County, West Tennessee where the river flows through an abandoned Mississippi...

Project Controls on the Channel Tunnel Project
Establishing controls for a multi-facted, multi-billion dollar, privately financed, project which is run by two organisations created solely for that one project has been a major challenge....

Boston Central Artery/Tunnel Project?Fort Point Channel I-90 Tunnel Crossing
Part of the Central Artery and Third Harbor Tunnel Project involves the construction of a very unusual section of immersed tunnel. While the Third Harbor Tunnel which will cross Boston...

Electronic Communication Between Project Participants
Fragmentation in the U.S. construction industry is perceived as one of the major contributors to reduced productivity. Lack of communication may be the main difficulty. Communication is...

Partnering on the Bonneville Navigation Lock
The Portland District of the Corps of Engineers has found partnering to be a valuable technique for contract and project management. This paper presents details of the execution of the...

Surface Renewal Due to Large Flow Structures in Open Channel Flow
It is shown that under certain flow conditions, surface renewal cannot be understood as an exclusive result of the bursting occurring near the wall, as proposed by several authors. Flow...

Gas Transfer at Hydraulic Structures
The objective of this paper is to identify and briefly summarize the state-of-the-art in measuring and describing gas transfer at hydraulic structures. Basic theory of mass transfer at...

Sidestream Elevated Pool Aeration Station Design
The Metropolitan Water Reclamation District of Greater Chicago (MWRDGC) is constructing a system of five Sidestream Elevated Pool Aeration (SEPA) stations along the 35.8 mile Calumet River,...

Current Conditions and Future Prospects of Marinas in Japan
The number of so-called marinas and yacht harbours in Japan is said to be as many as 1,000 at present. In this report, the findings of a survey on 365 marinas which appear to satisfy the...

North Point Marina ? A Case Study
North Point Marina is a full service, 1493 boat marina constructed by the State of Illinois on the shoreline of Lake Michigan to serve boaters from northeastern Illinois. Because of its...

Predicting Sedimentation in Shallow Draft Coastal Ports
The U.S. Army Engineer Waterways Experiment Station is conducting a study to develop and improve design guidance for shallow draft coastal ports. As part of this effort and to fill gaps...

Japan New Standards for Excellence in Marina Design
It describes the status quo of marinas in Japan and the establishment of a new authorization system for superior marinas....

Prospectus for Marinas 2000
This paper is an outline presentation of the method of achieving a proposed specialty workshop on marina planning, design, and construction for the Twenty-First Century by the Waterway,...

Burns Waterways?Boat Capacity Study
The results of a boat capacity study for the Burns Waterway located in the city of Portage, Indiana, close to the southern tip of Lake Michigan are presented. More than 650 recreational...

The Design & Construction of Marina Martinique, S. Africa
Marina Martinique is a coastal residential marina in the eastern Cape Province of South Africa which will ultimately accommodate 730 moorings and 1100 low rise residential units, most...

Partnerships with SOBA
During the past 25 years, the number of registered watercraft tripled to the current number of 17.8 million registered watercraft in the USA. To meet a growing demand for safe waterway...

 

 

 

 

Return to search