Practical Use of Plants for Water Purification
Problems with contaminated wastewater in USA, Eastern Europe, and developing countries are outlined. Botanical sewage purification for purifying human, animal, and industrial sewage is...
Constructed Wetlands at Mesquite, Nevada
Subsurface flow (SF) wetlands are used to provide effluent polishing following treatment in an aerated lagoon at Mesquite, Nevada. General SF wetland design methodology is discussed in...
Reliability-Based Estimates of Wetland Detention Times for Wastewater Treatment
Determination of the hydraulic residence or detention time is often the first step in design of wetlands constructed for wastewater treatment. Current methods for estimating wetland detention...
Design Considerations for Control of Volatile Organic Compounds at Wastewater Treatment Facilities
New federal and state regulations require publicly owned treatment works (POTW's) to consider emissions of volatile organic compounds (VOC's) as potentially significant...
Continuing Effort to Eliminate Odors at Orange County's Wastewater Treatment Plants
The County Sanitation Districts of Orange County (CSDOC), California own and operate two wastewater treatment plants. Reclamation Plant No. 1, in Fountain Valley, treats approximately...
Case Studies of POTW Air Toxic Emission Tests and a Proposed Emission Control Strategy
Air toxic emissions and associated human health risk at wastewater treatment plants can be reduced with a phased implementation strategy. An evaluation of major conventional secondary...
Influence of Moisture Influx on the Hygro-thermal Performance of a Clay Buffer Developed for Nuclear Disposal Vault
This paper focusses on an experimental study that investigates the heat transfer and moisture movement within a bentonite clay buffer compacted in a borehole located in a granite block....
Composite Liner, Leak Detection System, and Floating Cover for Nuclear Reactor Emergency Retention Basins
Existing reactor effluent basins are being retrofitted with composite liners, leak detection system and floating covers. Such basins have a 15-year life and remain empty until an accident...
Slurry Bioremediation of Petrochemical Waste Sludges
Slurry bioremediation testing was conducted on waste sludges from petrochemical production. The study concludes that the apparent mechanism for remediation of the waste involves an initial...
Assessment of Effects of a Water Supply Withdrawal on Downstream Flows for Anadromous Fish Reproduction
A BASIC computer model was developed to simulate reservoir operations in conjunction with a proposed water supply withdrawal. The model was used to assess the potential impacts of the...
Substrate Effects on Methanotrophic Trichloroethylene Degradation
Formate up to 1g/L had no significant enhancing effect on the degradation of trichloroethylene (TCE) by three mixed enrichments of methane-oxidizing bacteria. Methanol did not enhance...
Degradation of 1-Naphthylamine by Activated Sludge Using Bioaugmentation
This paper presents the results of ongoing research using a novel bioaugmentation scheme for activated sludge (AS) treatment of trace levels of a hazardous compound (1-Naphthylamine, 1NA)....
Removal of Priority Pollutants in Industrial and Hazardous Wastewaters
With the implementation of effluent standards based on water quality criteria, more and more situations arise where the capabilities of treatment technology is stretched to their limits...
Redevelopment of Remediated Superfund Sites: Problems with Current Approaches in Providing Long-Term Public Health Protection
The normal primary objective of Superfund site remediation is the control of hazardous chemicals so that they do not represent a significant threat to public health and the environment...
Development of Effective Remediation Criteria
Clean-up criteria for remediation of hazardous waste sites take several forms. These vary from simple sensory parameters, e.g., visual evidence of contamination to specific numerical criteria...
Performance Analysis of Remedial Alternatives
This paper demonstrates how remedial action alternatives for a Superfund site can be evaluated using a health-risk basis. The case history for this demonstration is a Feasibility Study...
Construction Management at Sikes Superfund Site
Lockwood, Andrews & Newnam, Inc. (LAN) is providing Construction Management services on the Sikes Superfund site. The project involves constructing an incinerator on-site and incinerating...
The Observational Approach in Environmental Restoration
The U.S. Department of Energy (DOE) has committed to completing environmental restoration of its facilities within the next 28 years (DOE 1990). To achieve this, DOE must ensure that its...
An Analysis of Modeling Techniques in Pollution Management of Natural Water Systems
This paper will focus on various models to demonstrate the difficulties with modeling techniques. The difficulty with developing a valid model for a system is explored through the study...
Who is Taking Out the Garbage?
Due to the shortage of landfill space and the increasing amount of waste being generated, current waste disposal techniques should be studied and revised. New methods should be implemented...
Return to search