An Investigation of a Pumped Storage Hydropower System
In order to provide a realistic basis of determining the viability of a wind-powered hydroelectric system at a potential site, an evaluation technique has been developed. Basically, this...

Simulations of Multireservoir System Operation
Simulation modeling has evolved from a direct examination of operating policies into operational decision support systems, integrated multiple use expansion planning systems and special...

Some Pertinent Considerations in Dam and Reservoir Design
Two important considerations in designing and constructing a multipurpose earthdam and reservoir are to minimize losses in the event of dam failure because of overtopping, and to conserve...

Thermally Developed Blade Stresses and Cavitation Damage
Cavitation damage to the turbine runner blades, to the draft tube liner, and to the runner hub requires extensive welding repair. The traditional repair method is to gouge out the damaged...

Lopez-Angostura Power Tunnel
The Lopez-Angostura Project is located on the Yaque del Norte River in the Dominican Republic near the City of Santiago. A 24 m high dam, a 3.6 km long power tunnel, a pit powerhouse with...

Tunnels and Vertical Shafts for Pumped-Storage
Economic considerations are of primary importance to the planning and designing of pumped-storage in an electrical generation and distribution system. This paper deals with the optimum...

Design of Steel Tunnel Liners
The paper presents a detailed development of the fundamental equations for internal pressure design, considering an elastic interaction between the steel liner and the surrounding rock...

Analysis and Rehabilitation of Ambursen Dams
This paper deals with the investigation and analysis of two Ambursen dams located in the upper Midwest. These investigations revealed that the original design contained significant defects,...

Moose River Air Chamber Design and Performance
The Moose River Hydroelectric Project is a 12.5 MW development located in upstate New York. It employs an underground air chamber to protect the unit and power tunnel from pressure surges...

New Clues to PMP
Great changes have occurred in meterology in the last two decades. Formerly, weather data were available for forecasting and climatological analyses only at points - at weather stations....

Clay Joints in the Foundation of Dkhila Dam
The stability analysis performed at the beginning of construction, taking into account the shear test results of the foundation claystone showed insufficient safety factors against sliding....

HYOPS?Maximizing the Value of Your Hydro River System
This paper presents a microcomputer based software system, HYOPS, to optimize the operations of a series of hydro plants on a river system. The model can accommodate up to 10 plants which...

Instream Flow and Energy Production Studies for Hydro Relicensing
A methodology for assessing the effects of alternative flow release scenarios on both aquatic habitat and on energy production was utilized during instream flow studies at a 72-MW hydroelectric...

Computerized Measurement of Turbine Flow and Performance, Including Penstock Protection
The application of computer technology now makes it possible to measure turbine flows accurately, reliably and economically. The measurement is based on the differential pressure produced...

Financing and Marketing Feasibility Tests for Proposed Federal Hydroelectric Power Projects
The Southwestern Power Administration (SWPA), an agency of the Department of Energy, is responsible for marketing the power and energy produced at Federal hydroelectric power projects...

Replacement of Computer Control at John Day Powerhouse
One of the first projects chosen by the Corps of Engineers for computer control was the John Day Project on the Columbia River. John Day powerhouse was completed in 1971 and has 16 generators...

Vibration Problems of Penstock Piping for a Vertical Tubular Hydraulic Turbine
Excessive vibration amplitudes were experienced in the vertical gated tubular units at the Great Falls Hydroelectric Project located in the City of Paterson, New Jersey. Vibration amplitude...

Computer Aided Design of Small Hydro Turbine?Phase II
Ateliers Bouvier have been expanding the use of its computer aided design (CAD) system during these last four years, and the aim of this paper is to present some additional aspects of...

Update: Ozark-Webbers Falls Turbines
The Ozark and Webbers Falls powerhouses were designed and constructed under the supervision of the U.S. Army Corps of Engineers. Both are located on the McClellan-Kerr Arkansas River Navigation...

Analyses of the Lower San Fernando Dam Failure
The main methods employed for the back analysis of the behaviour of the Lower San Fernando Dam during the 1971 earthquake are described. The requirements for a comprehensive analysis are...

 

 

 

 