Layout of a Powerhouse Adjacent to Lock and Dam Structures
An approach flow to a powerhouse intake adjoining existing lock and dam structures may cause a significant reduction in the efficiency of the powerhouse and give rise to an economically...

Design Data of Pump-Turbine and Francis Turbine Units
Some basic statistical data covering geometrical and energy parameters for Francis turbine and Pump-turbine units are presented. These data are further compared as specific ratios for...

Major Hydraulic Turbine Operation and Maintenance Problems Experienced by the Corps of Engineers
The U. S. Army Corps of Engineers is the largest owner/operator of hydroelectric power generating facilities in the United States with 344 generating units, having an installed capacity...

No. 1 Water Wheel Project, Gilman, Vermont
This paper describes the replacement of an old generating unit with a new unit in a turn-of-the-century mill building where three other such units were already operating. The key issues...

Hydropower Goes Downtown
Beneath a busy street in Southern California seems an unlikely location for a small hydroelectric generating plant. However, located just below El Segundo Boulevard in the town of El Segundo...

After L'Ambiance Plaza
In the aftermath of the tragic collapse of the L'Ambiance Plaza apartment building at Bridgeport, Conn., in April 1987, reforms are being proposed. In 1987 ASCE approved writing...

The European Underground
Three tunneling projects in Europe are described: a tunnel bored under two rivers in Lyon, France, a subway station constructed as a mined tunnel in Vienna, Austria and a tunnel mined...

Grout Supports Brooklyn Tunneling
At the Red Hook project in Brooklyn, microfine cement grout was injected from the surface to support underground tunneling. The hand-dug tunnel was built to connect to sewer pipes. Subsurface...

Planning, Design and Cost Estimates for RCC Dams
Engineers, planners, and officials of agencies responsible for developing water resource projects are confronted with preparing preliminary designs and cost estimates for dams. This paper...

Behavior of Completed RCC Dams
Enough roller compacted concrete dams have been completed to allow an overall evaluation of this new approach to construction. Performance has been good. No operational restrictions have...

Comparison of Joint Shear Strengths for Conventional and Roller Compacted Concrete
Direct shear test data for parent material and bonded and unbonded jointed specimens of conventional and RCC (roller compacted concrete) are presented and compared. Results are discussed...

Roller Compacted Concrete Mix Design for Pamo Dam
Pamo Dam is designed as a 265 foot (81M) high gravity dam that will be located on the Santa Isabel Creek in San Diego County, California. RCC volume will be approximately 491,000 cubic...

Monksville Dam: Design Evolution and Construction
This paper documents the application of experience gained at other RCC projects to the Monskville Dam. The evolution of the design and its translation to construction are presented together...

Quality of Works in RCC in France: A Contractor's Solution
Bec Freres S. A. , a French dam contractor, introduced the technique of roller compacted concrete (RCC) into France. The first two French RCC dams were built as a result of a program of...

RCC in Dams in Australia
The design, construction and performance of the first three dams constructed in Australia, using RCC are described. Aspects covered in the paper include designing for zero cohesion between...

RCC Pavements in Tasmania, Australia
Over 60,000 m**2 of high strength Roller Compacted Concrete (RCC) pavement has been completed in Tasmania, Australia, since December 1986. Projects have ranged from footpaths and small...

Corps of Engineers Experience with RCC Pavements
Roller compacted concrete pavements were first developed in the U. S. by the Corps of Engineers in 1975. Since that time, RCC pavements have been constructed throughout much of the U....

Treatment of Karst Along Tennessee Highways
The construction and maintenance of highways in karst areas of East Tennessee has resulted in the occurrence and treatment of induced sinkholes along the ditchlines of numerous highways....

Vibration Analysis Using a Parallel Lanczos Method
A parallel eigenvalue solution algorithm, based on the Lanczos method, has been developed, implemented on a Flexible Computer FLEX/32 multi-processor, and applied to an example structural...

Concurrent Nullspace Methods for Multibody Systems
This paper presents a new concurrent multiprocessing algorithm for simulating the dynamics of constrained multibody systems. The systems considered are quite general in nature; they may...

 

 

 

 