A Regional Management Plan to Improve Water Quality in the Grassland Basin
Seven irrigation and drainage districts on the west side of Californias San Joaquin Valley have formed a regional drainage entity to implement programs that will reduce the load of selenium...
Economic Issues Regarding Water Quality Objectives in the Grassland Basin
A conceptual framework is presented for evaluating the potential costs and benefits of water quality objectives in the Grassland Basin. The investments and expenditures required to achieve...
Flexible Water Deliveries: One District's Experience
The Merced Irrigation District (MID) has implemented two significant incentive programs in 1995 to provide surface irrigation water to farmers who have shifted to private wells for irrigation....
Advanced Seawater Desalination Plant
A project that will demonstrate an enhanced seawater desalination process that operates in combination with upgraded existing coastal power plants to meet part of the projected water needs...
Value Engineering Changes to the Eastside Pipeline
Value Engineering is a process of applying analytic, creative and evaluative techniques to a project in order to make recommendations that will, when implemented, maximize value and quality...
The Secondary Inlet of the Eastside Pipeline Project
The subject of this paper is a design feature included in the current capital improvement program of the Metropolitan Water District of Southern California. This feature, the Secondary...
Mobile Bay Scour Analysis for Mobile and Baldwin Counties, Alabama
Scour analyses were prepared for ten bridges and causeways in and around Mobile Bay on the Gulf Coast of Alabama. Interactions between riverine floods on the Mobile River and tidal storm...
South Carolina Department of Transportation's Statewide Program of Bridge Scour Evaluation
The South Carolina Department of Transportation (SCDOT) has instituted a program to satisfy the FHWAs requirements to evaluate the scour potential of the Nations bridges. The SCDOT's...
Artificial Recharge Using Inflatable Rubber Dams
Artificial recharge of ground water is a necessity in Orange County, California, where natural recharge is insufficient to satisfy water demands. Orange County is part of a semiarid coastal...
Artificial Recharge of a Buried Glacial Aquifer in South Dakota
The Huron Project of the High Plains States Groundwater Demonstration Program was designed to artificially recharge a buried glacial aquifer in eastern South Dakota High flows from the...
Modeling Groundwater Response to a Perimeter Flood
A large industrial facility in the west of France was impacted by a flood in January 1995. Costs associated with the disruption in one week of production were estimated at $15E6 US. In...
Concept Ecology Integrated Project Engineering and Environment; Relating a Project to the Surroundings
The selected alignment of the 27.3 km long Veterans Expressway in Tampa, Florida was constructed for better access to the downtown area from a relatively rural but fast growing area of...
Wetland Mitigation Evaluation Ten Years After Florida Keys Bridge Replacement
From 1912 to 1935, the Florida Keys were connected to the mainland by Henry Flagler's Overseas Railroad. The 1935 Labor Day Hurricane destroyed most of the railroad from Plantation...
Rehabilitating Arctic Tundra in Alaska
During the past 25 years, there has been significant progress in tundra rehabilitation. Initially, agronomic practices requiring large quantities of grass seed and fertilizer were believed...
Oil Spills: Prevention, Prediction, and Preparation
This paper summarizes some of the state and federal rules, assessment techniques, and response procedures being used by marine terminals along coastal California to prevent, predict, and...
Risk Analysis of Drinking Water Treatment and Supply Facilities Handling Highly Hazardous Chemicals
Due to increasing public concern of risks from handling highly hazardous chemicals at various facilities, a number of state regulatory agencies, including the State of California, have...
Fluidized Bed Denitrification of Secondary Effluent during Wastewater Reclamation in Southern California
A pilot scale fluidized bed denitrification bioreactor was operated for a period of three years as one unit process in a series designed to repurify secondary effluent for subsequent indirect...
Evaluation of Modelling Needs for Central Valley Project Operations
The Bureau of Reclamations Central Valley Operations Office (CVO) has responsibility for planning, implementing, overseeing, and coordinating the various operations of the Central Valley...
Annual Delivery Decisions in the Simulation of the California State Water Project and Federal Central Valley Project using DWRSIM
This paper presents a new annual contractor delivery determination procedure for the California Department of Water Resources' State Water Project (SWP) and Central Valley...
Grade Control Structures for Pipeline Crossings in the Arid Southwest
Pipeline crossings at streams, rivers, and washes are at risk due to bed and bank erosion in the river environment. Buried pipelines may be exposed in the channel bottom by scour of bed...
Return to search