Glen Canyon Environmental Studies Resource Response Analysis
The primary objective of the Glen Canyon Environmental Studies is to determine how the resources of the Grand Canyon respond to the operations of Glen Canyon Dam. Two levels of analysis...

Bio-Economic Models for Measuring the Economic Effects of Hydropower on Anadromous Fish Populations in the Pacific Northwest
An empirical model is presented for predicting the net economic value of changes in recreational catch of salmon and steelhead in Oregon, Washington and Idaho associated with construction...

Simulation of the Stanislaus Project: Performance of the U.S. Fish and Wildlife Service Instream Temperature Model on a Complex System
The primary objective of the study was to characterize the temperature regime of the MFSR Middle Fork Stanislaus River and determine the effect of alternate release flows on stream temperature...

Systems Analysis for Fisheries Protection and Mitigation at Corps of Engineers Columbia River Dams
Pacific Northwest anadromous salmon and steelhead that migrate to and from the ocean are greatly affected by the numerous Columbia and Snake River dams they have to pass, first downstream...

Hydropower Simulation: An Overview
Numerous models have been developed for production costing and generation system expansion which include operation of hydropower in the system. These models rely on energy production and...

A Short-Term Hydro Scheduler for Hydro-Thermal Power Systems
This paper presents HYDSIM (Hydro-electric Simulation), a new versatile computer model developed to simulate the hourly or daily operation of a large network of multi-purpose reservoirs...

Real Time Hydropower Scheduling for Niagara Mohawk Power Corporation
Niagara Mohawk Power Corporation (NMPC) presently manually schedules their hydro system of 660 MW (80 stations in ten river basins). The scheduling procedures are labor intensive and relatively...

Multisite Hydrocomplex Optimization
A multisite complex is analysed in northern Quebec to decide the level of equipment needed that will supply firm energy at the best possible unitary price. Four possible sites were chosen...

Simulation of Irrigation and Reservoir Water Use
Computer simulation of irrigation water use and corresponding downstream reservoir operation has been developed for the Canyon Ferry Reservoir on the Missouri River in Southwestern Montana....

Computer-Aided Operation of a Hydropower System
This paper outlines the development of a computer model which optimizes the operation of a regulated river system given certain constraints using an adaptive deterministic linear programming...

Computerized Operation Models of Oroville Reservoir
Two monthly computer operational models, OROTHM1 and OROTHM2, were developed to provide more detailed operation and maintenance studies for the Oroville facilities. Currently another computer...

Hydrologic Dispatch Model for a Hydropower System
A hydrologic dispatch model was developed for an 11 plant, six reservoir hydroelectric system. The model incorporates load forecasting, system dispatching strategy, and database management...

Stochastic Optimization of Reservoir Systems Operations
This paper addresses the stochastic optimization of real-time monthly operations of multi-reservoir systems by Dynamic Programming. A two-stage optimization framework that consists of...

Development of Hydroelectric Scheduling Model
This paper presents the proposal preparation, pre- and post-award negotiations, and the engineering and computer software development of an hourly generation scheduling model. The Western...

Hydrologic Studies for Dinkey Creek Hydro-Electric Project
The economic analysis and final design of the 120 MW hydro-electric development on Dinkey Creek, a tributary of the North Fork of the Kings River in the Central Valley of California, requires...

Hydrologic Design Methodologies for Small-Scale Hydro at Ungauged Sites
IMP is a microcomputer package for evaluating small-scale hydroelectric power sites in British Columbia. With IMP it should be possible for an experienced hydroelectric engineer to make...

A Case for Selecting Only Deterministic Spillway Design Floods for High Hazard Dams
The Federal Energy Regulatory Commission has under license or exemption from licensing more than 2000 hydroelectric dams. The Office of Hydropower Licensing published, in September 1986,...

Cedar Falls Project-Rehabilitation with RCC
This paper presents an overview of the planning, design, and construction considerations used during the development of the 9. 1 m (30-foot-high) Cedar Falls Roller Compacted Concrete...

Performance of Draft Tubes for Small-Hydropower Turbines
Tests of several conical and elbow-type draft tubes were conducted with varying degrees of upstream swirl. This swirl was generated by variable-geometry vanes. Draft tube efficiencies...

Marginal Small Hydro Can be Made Viable
This paper presents the design and construction aspects of a 1,235 kW small hydro power development, comprising a new dam, gated spillway, intake canal, intake, penstock, tunnel, in-ground...

 

 

 

 