Marginal Small Hydro Can be Made Viable
by E. A. Farag, SNC Ltd, Albany, NY, USA,Document Type: Proceeding Paper
Part of: Water Power '87
Abstract:
This paper presents the design and construction aspects of a 1,235 kW small hydro power development, comprising a new dam, gated spillway, intake canal, intake, penstock, tunnel, in-ground powerhouse and tailrace canal. The work was completed in 8 months based on critical planning and optimum design, operation and construction efficiency.
Subject Headings: Water intakes | Power plants | Hydro power | Canals | Spillways | Infrastructure construction | Hydraulic design
Services: Buy this book/Buy this article
Return to search