Marginal Small Hydro Can be Made Viable

by E. A. Farag, SNC Ltd, Albany, NY, USA,



Document Type: Proceeding Paper

Part of: Water Power '87

Abstract:

This paper presents the design and construction aspects of a 1,235 kW small hydro power development, comprising a new dam, gated spillway, intake canal, intake, penstock, tunnel, in-ground powerhouse and tailrace canal. The work was completed in 8 months based on critical planning and optimum design, operation and construction efficiency.



Subject Headings: Water intakes | Power plants | Hydro power | Canals | Spillways | Infrastructure construction | Hydraulic design

Services: Buy this book/Buy this article

 

Return to search