Small Hydro Analysis and Reporting Program
The Ontario Ministry of Energy initiated a project to develop an analysis program based upon metric measures and Canadian costs. The Ministry of Energy of the Province of Ontario has been...
Spreadsheet Applications for Hydropower Developers and Operators
This paper will examine the role of spreadsheet analysis in all aspects of hydropower development. The structure of the presentation will be first to briefly present an overview of the...
Non-Federal Hydropower Development at Federal Facilities from the Project Developer's Perspective
The City of Santa Clara Electric Department has three small hydroelectric projects in various stages of development at federally-owned facilities. Although all three of the Federal Energy...
New Directions in Financing Water and Power Projects
The financing of water and power projects is not business as usual. Two changes in recent times have resulted in major realignments in the way water and power projects are being financed....
Staged Water Resource Development Can Improve Economics and Advance Project Implementation
This paper provides reasons for staging, and describes functional types of staged developments, and planning and evaluation of these developments. Many water resources projects can be...
Development of Turbine Intake Downstream Migrant Diversion Screen
Prior to the spring of 1986 Public Utility District No. 2 of Grant County had developed a passive turbine intake screen design. A prototype of this design was placed in the emergency gate...
Protection of Juvenile Anadromous Fish
Protection of juvenile anadromous fish (salmon, steelhead, etc. ) during their seaward migration is a major concern in the Pacific Northwest. The existing screening structures at the head...
Bio-Economic Models for Measuring the Economic Effects of Hydropower on Anadromous Fish Populations in the Pacific Northwest
An empirical model is presented for predicting the net economic value of changes in recreational catch of salmon and steelhead in Oregon, Washington and Idaho associated with construction...
Hydrologic Studies for Dinkey Creek Hydro-Electric Project
The economic analysis and final design of the 120 MW hydro-electric development on Dinkey Creek, a tributary of the North Fork of the Kings River in the Central Valley of California, requires...
DURAPLOT: A Flexible Approach to Hydropower Site Optimization
The U. S. Army Corps of Engineers, North Pacific Division Office has over the past six years performed reconnaissance and feasibility level hydropower studies at a variety of sites throughout...
A Case for Selecting Only Deterministic Spillway Design Floods for High Hazard Dams
The Federal Energy Regulatory Commission has under license or exemption from licensing more than 2000 hydroelectric dams. The Office of Hydropower Licensing published, in September 1986,...
Cedar Falls Project-Rehabilitation with RCC
This paper presents an overview of the planning, design, and construction considerations used during the development of the 9. 1 m (30-foot-high) Cedar Falls Roller Compacted Concrete...
Performance of Draft Tubes for Small-Hydropower Turbines
Tests of several conical and elbow-type draft tubes were conducted with varying degrees of upstream swirl. This swirl was generated by variable-geometry vanes. Draft tube efficiencies...
Small-Scale Hydro Power in Cold Climates
Small-scale hydro power is mostly developed under more pressing economical conditions than large hydro. It is therefore of great importance that the operation and maintenance costs are...
Marginal Small Hydro Can be Made Viable
This paper presents the design and construction aspects of a 1,235 kW small hydro power development, comprising a new dam, gated spillway, intake canal, intake, penstock, tunnel, in-ground...
Improving Design of Small Hydro Plants
One objective of this paper is to show why certain features of many small hydro plants have given poor operational performance or experienced expensive maintenance problems. A second objective...
Status and Prospectives of Small Hydro Power Development in Egypt
The paper describes the current status of hydropower development in Egypt and its future prospects. Emphasis is made on reviewing the potentialities for small, mini and micro-hydropower...
Murray Hydro Project?Structural Design
This paper will summarize design criteria, parameters, methods of analysis, and other relevant data that were used in the design process of the structural features of the Murray powerhouse...
Conceptual Design of Salt Caves Hydroelectric Project
The Salt Caves Hydroelectric Project, as proposed by the City of Klamath Falls, Oregon, is a prime example of a project where the design has been based on elimination and minimization...
Hydro Combine Option for Lakhwar Project
A new concept of providing a power house cavity inside the traditional gravity dam section has been explored. Preliminary investigations indicate that taking into account all the relevant...