Affordable Housing
a Challenge to Civil Engineers
This conference proceedings, which consists of 25 papers presented at the National Conference on Affordable Housing held in Miami, Florida on December 6-8, 1989, discusses ways that the...
Resilient Moduli of Soils
Laboratory Conditions
Historically, structural pavement design has been based on static testing techniques, such as the CBR. More recently, the profession has placed increased emphasis on repeated load testing...
Contractability?Recent Concepts in Contracting
Owners are customizing project delivery systems by uniquely aligning service agreements and construction contracts. Seeking more productive ways to construct facilities, owners currently...
Issues in Computer Based Design/Construction Integration
Design and construction processes are widely regarded as too splintered for industry effectiveness. By improving communication and process integration, reduced costs and improved facilities...
Applications of Computer Graphics in Construction
Stone & Webster Engineering Corporation has implemented an integrated computer system for engineering, design, construction planning, and project management based on a relational...
Effectiveness of Computers in Construction Execution
Although the effectiveness of computers in construction control during execution has been shown in several case studies, their use is largely made for planning functions. Also, their use...
Microcomputers in Construction Claims
The increase in litigation is driven primarily by economic factors. The increased use of microcomputers has followed as a direct result of the need for better information control and dissemination....
Why Not a Microcomputer at Each Construction Site?
This paper first considers some of the issues concerning when (and even whether) such an idea is practical. It then looks at how to increase the likelihood of obtaining the desired results....
Transition to Facility Management
The introduction of Computer-Aided Design and Drafting (CADD) capability into facility planning, design, construction, and management provides the capability to better generate, manage,...
Potential Misuse of Construction Scheduling Software
The advent of microcomputers, coupled together with the development of many easy to use and economical scheduling packages, has placed a very powerful tool in the hands of construction...
AEC Experience with Expert Systems in Construction
The application of expert systems in the construction industry requires the use of general-purpose computers, such as microcomputers, minicomputers, and mainframes. The use of commercial...
Knowledge-Based Construction Project Planning
This paper describes CONSTRUCTION PLANEX as a prototype of a knowledge-based construction process planner. CONSTRUCTION PLANEX is a knowledge-based system that generates project plans...
Integrated Automation for Site Work
Technologically, computer integration can be built around four component systems; (a) a computer system to maintain unified data and control real-time operations, (b) a metrology system...
Real-time Animation of Construction Activities
As a result of 3-D computer modeling, the availability of geometric data in an electronic form makes possible the use of computers for purely construction activities in ways that were...
Automated Position and Control Systems Using Lasers and Electromagnetic Signals
Positioning is a crucial area in the successful integration of CAD data into the construction process. This paper looks at several areas of positioning using lasers and electromagnetic...
Real-time Monitoring of Heavy Equipment in Open Pit Mines
This paper reports on a system with local intelligence to interpret on-board signals. Existing sensors, pressure switches, warning lights, relays, and on-board monitoring systems provide...
Utilizing On-Site Computer-Based Information Systems
This paper addresses the topic of data base management systems and their use by small and medium-sized construction companies. Specifically, the use of personal computer based software...
Discussion of the Use of Multi-Design Contracts
The paper begins by defining the multi-prime contract for design services, under which there is more than one contract between design professional and owner for a single project. It then...
Visual Scheduling
This paper presents a look at new innovative way to provide project schedule. The primary target is in visual scheduling presentation techniques. The systems presented include a system...
Eliminating Bias in Construction Schedules to Measure Time
Schedules developed for use in managing the construction process which are accurate for that use are not necessarily sufficiently accurate to measure and evaluate delays and changes to...
Return to search