Lining the Line
Having succeeded in achieving dry stations and tunnels in mined construction, flexible waterproofing membranes are now being used to waterproof cut-and-cover subway stations and old, leaking...
Accessing Atlantic City
Construction of the 2.2 million sq ft Atlantic City Convention Center is well under way. With 486,000 sq ft of exhibition space, the center and accompanying rail terminal could help restore...
Capital Facelift Takes Flight
Since 1988, one of the largest and most complex airport renovation projects in U.S. aviation history has been under way in Washington, D.C. Known as the Capital Development Program, the...
Bridge Over the River Karnali
Just as topping Nepal's Mount Everest requires great stamina from mountain climbers, building the Karnali River Bridge in a remote region of western Nepal required six years...
Worth the Risk?
The construction process is fraught with uncertainties, but integrated, proactive risk assessment and risk management methods can help owners, engineers and contractors make better, informed...
Cable Corrosion in Bridges and Other Structures:
Causes and Solutions
This book provides the reader with basic facts concerning cable corrosion and means to avoid or rehabilitate corrosion damage. Corrosion problems associated with cable-supported structures...
Solving the Innovation Puzzle
Challenges Facing the U.S. Design & Construction Industry
This book provides a first-hand perspective of innovation in the design and construction industry.
A Simplified Process Audit to Design an Affordable Pollution Prevention and Waste Management Plan -
This paper presents a simplified approach to the general audit procedure that is applicable to the Small and Medium Enterprise (SME). The process leads to the identification of major sources...
Dynamic Optimal Groundwater Remediation by Granular Activated Carbon
Objective functions to describe the operating and capital costs of GAC treatment are incorporated into a control theory model for optimal pump-and-treat groundwater remediation design....
White River Fish Screen Project?Hydraulic Modeling
In 1983, Puget Sound Power and Light Company (Puget Power) proposed in a license application to FERC for the overall White River Project replacement of the existing fish screens constructed...
Engineering Features of the Red Bluff Research Pumping Plant
In 1995, the construction of the Red Bluff Research Pumping Plant (RBRPP) was completed. The pumping plant is a research facility for evaluating the biological/engineering features of...
Westlake Farms Demonstration Wetlands A Cooperative Effort
This paper describes the process for establishing a wetlands complex to evaluate environmental issues that could not be answered without the operation of a large demonstration project....
Design and Implementation of a Multi-Faceted Site Remediation
This technical paper presents a case history of the design, construction, and start-up of a multi-faceted site remediation system. The case history includes a description of the site background,...
Economic Issues Regarding Water Quality Objectives in the Grassland Basin
A conceptual framework is presented for evaluating the potential costs and benefits of water quality objectives in the Grassland Basin. The investments and expenditures required to achieve...
A Surface Collection Design Approach on the Lower Columbia River
Surface collection and bypass of downstream migrating juvenile salmon has the potential to help improve the survival of the Columbia River salmon population. However, surface passage on...
Surface Bypass-Collector Concepts and Performance
Surfacetype bypass collectors and concepts are described. Biological and engineering requirements to pass juvenile salmonids at Snake?Columbia River dams are presented. The components,...
Advanced Seawater Desalination Plant
A project that will demonstrate an enhanced seawater desalination process that operates in combination with upgraded existing coastal power plants to meet part of the projected water needs...
Groundwater Monitoring For a Tunneling Project
The Groundwater Monitoring and Management Plan, developed for the proposed tunnel reaches between Devil Canyon and City Creek, monitors and manages selected water resource features within...
Value Engineering Changes to the Eastside Pipeline
Value Engineering is a process of applying analytic, creative and evaluative techniques to a project in order to make recommendations that will, when implemented, maximize value and quality...
The Secondary Inlet of the Eastside Pipeline Project
The subject of this paper is a design feature included in the current capital improvement program of the Metropolitan Water District of Southern California. This feature, the Secondary...
Return to search