Programmable mMicroprocessors in Local Control of Hydro Power Plants
The main purpose of the control equipment is to provide the generator with means for operation of the power station equipment. There is a need for status information on the generating...
An Integrated Site Controller-Network Monitoring System for Small Scale Hydroelectric Sites
Over the past decade more and more small scale hydroelectric power developers have faced the question of the economic feasibility of installing microprocessor based control systems for...
Grand Coulee SCADA System Procurement
Purchasing a quality Supervisory Control and Data Acquisition (SCADA) or Energy Control System (ECS) at a reasonable price for a particular installation can be a challenging undertaking....
The Design and Operating Experience of a Multiplexer Application in Conventional Hydro Powerhouse Control
The design of the Bonneville Second Powerhouse control system presented an opportunity to replace conventional cables with a multiplexer system that would provide a two-way data communication...
Capabilities of Automated Control System Employing Advanced Programmable Controllers
This paper details Voith Hydro's range of experience in the use of Programmable Logic Controllers (P. L. C. 's) in the automation of new hydro electric sites....
Integrated Automatic Hydroelectric Plant Control
The increased acceptance and employment of microcomputers to control specific functions in small hydroelectric plants has led to computerized integrated total control of hydropower generation....
Accelerated Life Testing of Generator Coils
This paper presents a step-by-step procedure for doing a 400 hour, 60 Hz, 90 degree C accelerated life test on generator coils. Test procedure is as follows: 1. Initial coil examination...
Upriver Dam Hydroelectric Project Rehabilitation After Failure, Part A: Failure Investigation and Lessons to be Learned
A lightning strike caused electrical failure at Spokane's two Upriver power plants, resulting in the river overtopping Project embankments, and causing nearly 11. 5 million...
Pyrites Hydroelectric Project, Canton, New York
This paper describes the Pyrites Hydroelectric Project in Canton, New York, an 8-MW project completed in December 1985. The key to its successful development was a team approach that included...
Landmarks in Civil Engineering
Historic American engineering projects sampled in this article represent those documented in
Sewage Plant Engineered for Value
The Camden County (NJ) Municipal Utilities Authority was formed in 1972 to cope with suburban growth that had overloaded 34 primary treatment plants. By the early 1990s, the Authority...
Geotechnical Exploration and Site Preparation Techniques for Large Mall in Karst Terrain
A large commercial mall and secondary developments were planned for construction in a karst area near Clarksville, Tennessee. A geotechnical exploration was conducted to evaluate the occurence...
Treatment of Karst Along Tennessee Highways
The construction and maintenance of highways in karst areas of East Tennessee has resulted in the occurrence and treatment of induced sinkholes along the ditchlines of numerous highways....
Vibration Analysis Using a Parallel Lanczos Method
A parallel eigenvalue solution algorithm, based on the Lanczos method, has been developed, implemented on a Flexible Computer FLEX/32 multi-processor, and applied to an example structural...
Concurrent Nullspace Methods for Multibody Systems
This paper presents a new concurrent multiprocessing algorithm for simulating the dynamics of constrained multibody systems. The systems considered are quite general in nature; they may...
Parallel Algorithms for Structural Optimization Under Dynamic Loading
Parallel algorithms and strategies are outlined for optimal design of frame structures subjected to dynamic earthquake loading. Parallelism is extracted in six areas: substructuring of...
Structural Analysis and Parallel Computers
This paper discusses the implementation of a parallel program that performs a two dimensional rigid frame analysis on a NCUBE/7 hypercube multicomputer. The program was written in C and...
Finite Strip Method in a Parallel Computing Environment
The finite strip method has been used to model many systems in structural mechanics. The orthogonality of appropriately selected shape functions allows a continuous system to be effectively...
Geosynthetics for Soil Improvement: A General Report and Keynote Address
The paper summarizes major developments in the field of geosynthetics since the previous symposium in 1980. The paper addresses the engineering functions of major types of geosynthetics,...
Highway Factors in Truck Wrecks
An examination is presented of highway factors as they interact with driver and vehicle factors in large truck accident causation. Examples of highway defects are discussed along with...
Return to search