The American Association of Cost Engineers Claims Project
Construction contract disputes, or dressed in their popular nomenclature, 'contract claims', have become an established aspect of the non-residential construction...
Revitalization of Existing Buildings: An Owner's Perspective
Revitalization of the large stock of existing buildings in this country is of paramount importance today to building owners, who want the value of existing properties to appreciate as...
Changing Priorities in UK Construction Research
This paper addresses two types of situations to contend with in building assessment: aging structures all built at about the same time and to standards no longer acceptable, and newer...
Research Needs for Extant Iron and Steel Buildings
A brief review of iron- and steel-making processes is background for the development of shapes and codes. Sources of information for the condition assessment of iron and steel buildings...
Masonry Rehabilitation: Practice and Research
The rehabilitation of masonry buildings is a major construction activity in the United States. The available techniques and evaluation methodologies are limited to visual investigation...
Structural Integrity Assessment of the Flexible 870 Advanced Design Bus
The Grumman Flxible 870, a lightweight advanced design urban bus, entered service in Atlanta, GA in 1978, and some 2,800 of these buses were in service nationwide by 1980. In the autumn...
Effect of Voids on Creep Rate and Strength
The classic macroscopic Kachanov-Rabotnov model of material damage due to voids is reviewed. Detailed analyses of bulk mechanical properties of dilutely voided materials with certain,...
Transmission Tower Foundations in Weathered Rock
A case history is presented which discusses the siting, design and construction of the tower foundations for a transmission line in southwest Alaska. The project, completed in 1983, consists...
Restoring the Capitol's West Front
After 25 years of debate, preservation (rather than extension) of the West Front of the U.S. Capitol building in Washington, D.C. has begun. A network of stainless steel rods is being...
Romanesque Reused
When Union Station in St. Louis, Mo. was built in the 1890s it was the world's largest railroad station. Having been abandoned by the railroads in the 1970s, it was reopened...
Clearing the Decks
Cathodic protection, an electrical-chemical process that prevents corrosion of steel rebars on bridge decks, is rapidly gaining acceptance by highway engineers and state highway departments....
Construction Cost Control
The second edition of
Composite and Mixed Construction
Steel and reinforced concrete are frequently combined in composite or mixed structural systems. This combination generally results isn greater economy and safety than could be achieved...
Specifications for the Design and Construction of Composite Slabs and Commentary on Specifications for the Design and Construction of Composite Slabs
Composite slab construction is defined as a system comprising normal weight or lightweight structural concrete placed permanently over cold-formed steel decking in which the steel deck...
Making Computerized Project Control Systems Work?Background
Control systems can be considered as consisting of five major elements. These are: establish the objective or standard to be achieved-quality, maximum duration, resource utilization, maximum...
Construction Contractor Cost Control
Cost control for a contractor engaged in a fixed-price construction contract encompasses all actions directed toward the controlling or influencing the cost outcome of the project. When...
Project Management Software: What Is in the Future?
This paper predicts the future of project management software and provides a discussion of the assumptions made to develop these predictions. It provides a flexible framework for future...
Computers on the Project Team
This paper presents the utilization of various computer technologies as an integral part of the project team at a large multi-discipline Architectural/Engineering firm. Technologies discussed...
Painless Method of Using Computers in A/E Firms
There is now an efficient and economical method of using computer technology in a small A/E firm. The recent advances in microcomputer technology have made it possible to take advantage...
Administrative Aspects of Project Software
This paper reviews the various aspects of administering the development, control, and use of computer software employed to support the design office in the administrative and technical...
Return to search