Computers on the Project Team
This paper presents the utilization of various computer technologies as an integral part of the project team at a large multi-discipline Architectural/Engineering firm. Technologies discussed...
Painless Method of Using Computers in A/E Firms
There is now an efficient and economical method of using computer technology in a small A/E firm. The recent advances in microcomputer technology have made it possible to take advantage...
Administrative Aspects of Project Software
This paper reviews the various aspects of administering the development, control, and use of computer software employed to support the design office in the administrative and technical...
New Exchequer Dam, California
New Exchequer Dam design, in 1963, was in the transition period in which dumped rockfill was being recognized as having undesirable settlement characteristics, and compaction of rockfill...
Design, Construction & Performance of Fades Dam
The project, construction and performance of les Fades dam are described. Les Fades dam is one of the first concrete faced rockfill dams compacted with a vibratory roller. A vibratory...
Weak Rock in Two Rockfill Dams
Two South Australian concrete face compacted rockfill dams, built from soft rock won from each dam site, have performed successfully in service with only small leakage and settlements...
Alto Anchicaya Dam?Ten Years Performance
The general aspects of design and construction of the Alto Anchicaya Dam duilt during 1970 - 1974 in Colombia, South America are described. The paper refers to the performance of the structure...
Golillas Dam?Design, Construction and Performance
Golillas Dam is a concrete face, gravel fill dam, 125 m (410 ft) high built seven years ago that has had some difficulties during its initial operating years; due to the shape of the canyon,...
Concrete Face Rockfill Dams of the Winneke Project
Two of the three dams forming the Winneke Reservoir, near Melbourne, Australia, are concrete face rockfill dams. A minor dam forming the sludge storage pond for the project's...
Foz do Areia Dam?Design, Construction, and Behaviour
The 525 ft (160 m) high Foz do Areia dam in the Iguacu River, Parana, Brazil, built by 'Companhia Paranaense de Energia - COPEL', between 1975-1980, is part of...
Construction of Foz do Areia Dam
The methods and equipment for the construction of Foz do Areia Dam during 1976-1980 in Brazil are described. Special emphasis is given to the rockfill construction. Foz do Areia was the...
Design and Performance of Shiroro Rockfill Dam
Shiroro Dam, constructed across the Kaduna River in Nigeria, is a rockfill dam with reinforced concrete facing. The dam was completed in late 1983, and reservoir impounding started in...
Fortuna Concrete Face Rockfill Dam
The Fortuna Dam is a 60 m high concrete face rockfill dam located in Panama, designed to be built in two stages. This paper describes the construction of the first stage dam, 60 m high,...
Design Features of Salvajina Dam
Salvajina dam is the second highest concrete face rockfill dam currently in service in the world. The characteristics of the foundation of the toe slab vary from fresh, sound and little...
Construction and Performance of Salvajina Dam
Salvajina Dam was constructed between July, 1982 and November, 1984. Relevant construction aspects are described, particularly those related with procedures and statistical data of the...
Khao Laem?A Concrete Face Rockfill Dam on Karst
A continuously reinforced concrete faced rockfill dam has been successfully designed and constructed on a karstic limestone foundation in Central West Thailand. The dam is not in an earthquake...
Design and Construction of Terror Lake Dam
Terror Lake Dam is a central feature of the 189 million Terror Lake Hydroelectric Project, located on Kodiak Island Alaska. The dam is a 193-feet (59 m) high concrete-faced zoned rockfill...
Kotmale Dam and Observations on CFRD
A concrete faced rockfill dam was the type selected for the 300 ft (90 m) dam at Kotmale in Sri Lanka for reasons of economy and speed in construction. Standard design concepts were tailored...
Design of Concrete-Faced Rockfill Dams
Design principles adopted in 1966 by the Hydro-Electric Commission have been applied to nine concrete-faced rockfill dams and remain substantially unchanged. Experience shows that the...
Construction of Concrete Face Rockfill Dams
The Hydro-Electric Commission, Tasmania, Australia has been building concrete face rockfill dams since 1968. Eight dams from 26m to 110m high have been completed, and the highest at 122m...
Return to search