Computer Aided Simulation of Fluid-Structure Interaction Problems
The papers included in this book represent state-of-the-art developments in and applications of computer aided simulation of fluid-structure interaction problems in both the terrestrial...

Guide for the Design and Use of Concrete Poles
Prepared by the Concrete Pole Task Committee of the Committee on Electrical Transmission Structures of the Structural Division of ASCE. This guide presents...

Temporary Structures in Construction Operations
Temporary works have a primary influence on the quality, safety, speed and profitability of all construction projects. They provide access, support and protection of a facility under construction....

Foundations and Excavations in Decomposed Rock of the Piedmont Province
The five papers in this volume deal with foundations and excavations in the Piedmont Province of the USA. This is a region underlain by very old metamorphic rocks that are overlain by...

Making Embassies Safe for Democracy
American interests overseas have become among the most popular targets for terrorist attacks. Once, not long ago, security was only an afterthought for such facilities. Today, $4.4 billion...

Spanning the Seas
A proposed structural scheme, called the V�tower system, could cross vast stretches of water with record length spans yet use only conventional materials. An example is a bridge proposed...

Water Jets: Concrete Yes, Tunneling Maybe
High pressure water jets are demolishing concrete from bridge and parking decks, faster and at lower cost than by traditional means. The technique is fast becoming an acceptable option....

Computer Scheduling: On-Line and On-Time
The Intermountain Power Plant, a coal fired, 761 MW coal fired electrica generating facility, has been completed months ahead of schedule and substantially under budget. Project managers...

Lawyer on a Microchip
Construction in the 1980s have become a complex, high stakes, intensely competitive business. For architects and engineers involved, the prospect of lawsuits has grown tremendously. An...

Expert Systems for Risk Analysis
An explanation is presented on why construction risk analysis can be handled by an expert system computer program. The author offers a prototype construction risk management expert system...

Building Frame Analysis in Basic
Moment distribution has, for the past 30 years, been the most popular method of analysis for statically indeterminate structures. Programmed in Basic for the microcomputer with relative...

Case Studies?Semi-Closed Pipeline Systems
The paper discusses the title subject in terms of automated systems, flexible scheduling, and system components. Project locations include the Mahaweli Development Project, Sri Lanka;...

Case Study?Open Pipeline System, Coachella Valley Water District
A supervisory canal control system installation was started in 1966, seventeen years after start up, and a major upgrading was completed in 1983. The canal delivery system now has a central...

Stepped Spillway Design with a RCC Dam
The hydraulic model study results for the Upper Stillwater stepped spillway design are presented. The studies encompassed several spillway geometries and design unit discharges ranging...

Parametric Analysis of Concrete Gravity Dams using Finite Element Analysis
More sophisticated means of analyses have been investigated to determine the accuracy and applicability of conventional methods to a range of parameters affecting stability. This paper...

Rehabilitation Measures?Wanaque Reservoir System
The rehabilitation of Pompton Lake Dam and the dams of the Wanaque Reservoir System has provided the North Jersey District Water Supply Commission with a safe, dependable source of water...

Rehabilitation of Williams Bridge Dam
Pennsylvania Gas and Water Company initiated construction work to upgrade the 90-year old dam in order to meet current dam safety standards with emphasis on satisfying Probable Maximum...

Hydraulic Design of Pamo Dam Spillway
The design of the emergency spillway for the San Diego County Water Authority's (SDCWA) proposed Pamo Dam is discussed. Pamo Dam is a 264-foot (80. 5 meter) high roller compacted...

Design of Overtopping Protection for Small Dams
Many existing small embankment dams in the United States cannot safely pass current design floods without overtopping. In the past several years, embankment overtopping protection has...

Spring Creek Dam is Ready for the PMF: A Case History
Spring Creek Dam is the first earth embankment dam in Colorado, with inadequate spillway capacity, to be modified utilizing roller compacted concrete (RCC). With a structural height of...

 

 

 

 