Development of a GIS for the U.S. Great Lakes Shoreline
The Computer Mapping Center of the Detroit District, U.S. Army Corps of Engineers (USACE) is developing a Geographic Information System (GIS) to contain physiographic, demographic, and...

Southwest Pass Training Structure Alternatives
The U.S. Army Engineer Waterways Experiment Station system of computer programs, TABS-2, was utilized to evaluate various structural plans for increasing channel velocities and sediment...

Grid Requirements for Numerical Models Containing Training Works
The numerical modeling of the rapid changes in flow variable in open channel flow systems containing training works, such as dikes, requires special attention in grid development. This...

Utilization of Expert Systems for the Operation of Reservoir Systems
This paper illustrates how knowledge-based expert systems can obtain, organize, document, store, and utilize valuable complex reservoir systems experience, obtained by experienced water...

Risk Assessment of System of Dams
The application of risk assessment to a series of dams on a river is presented here. A general discussion of the basic principles of risk assessment approach to dam engineering is given...

Elements of a Coastal Stormwater Drainage System
Several elements in the design of a stormwater drainage system that outfalls to the ocean are discussed. The paper discusses a study conducted of the Ocean Lakes Watershed near Myrtle...

Model for Determining the Optimal Rehabilitation and Replacement of Water Distribution System Pipes
K.E. Lansey and L.W. Mays developed a new methodology for the minimum cost design of new and expansion of existing water distribution systems. This methodology interfaces a nonlinear programming...

The Hydro Business: 1990 and Beyond
During the last ten years, hydroelectric generation received more and more attention as a source of reliable and economical electricity. Since the first WATERPOWER conference, the industry...

Joint Economic Evaluation of Pumped Storage in Colorado
This paper summarizes a joint planning study completed in December 1988 on the economic potential of pumped-storage development. The study was unusual in water development investigations...

Devil Canyon Second Afterbay
This project is located in the City of San Bernardino (Southern California). The addition of a second afterbay for the Devil Canyon Powerplant has been in the planning stages since October,...

Automation of Existing Dam Control Schemes
For installations that are already in operation, the following advantages are obtained from installing new electronic equipment: In the case that the dam or certain measuring stations...

Management System for Power Plants Tecaid Maintenance System
Operational conditions and production levels are maintained at consistently higher levels when a planned maintenance system is used. Initial operational expenses for a planned maintenance...

The Modification of Leroy Anderson Dam
An extensive modification program has been implemented to improve the safety and enhance the performance of the Leroy Anderson Dam. The Leroy Anderson Reservoir has a maximum storage of...

Regional Rivers Resource Assessment as a Tool for Hydropower Planning and Policy: The Pacific Northwest Rivers Study
In August, 1984, the Bonneville Power Administration (BPA) and the Northwest Power Planning Council (Council) initiated a study to provide information about important river characteristics...

HYOPS?Maximizing the Value of Your Hydro River System
This paper presents a microcomputer based software system, HYOPS, to optimize the operations of a series of hydro plants on a river system. The model can accommodate up to 10 plants which...

Bonneville I Powerhouse Station Service Unit Rehabilitation
This paper presents the work being done towards the rehabilitation of the Bonneville I station service unit. The rehabilitation of this unit includes a generator rewind, excitation system...

Vertical Axis Hydro Turbines for Off Grid Installations
This paper describes the design, manufacture and testing of a 5 kW floating VAHT for use in tidal, ocean, and river installations. This work is based on the results of research contracts...

Retrofitting of Hydro Electric Generators with Bus Fed Solid State Excitation Systems
The Northern Hydro Division has completed retrofitting the excitation systems on 22 generating units ranging in output from 1 to 95 MWatts. The Big Creek Hydro Project upgraded these systems...

Optimizing Joint Load Control for Hydroelectric Plants
This paper discusses a method to minimize water usage at a multi-turbine hydroelectric generating plant. At plants which do not spill water this optimization is directly converted to extra...

Electrical and Mechanical Design, Commissioning, and Performance of the Moose River Hydroelectric Project
The Moose River Hydroelectric Project is a single-unit run-of-river hydroelectric facility located near Lyonsdale, New York, and was developed by a private firm. The generating equipment...

 

 

 

 