Hydropower: Making Its Mark in North America
To discover what plans North American hydropower producers have for their hydroelectric resources in the 1990s, Hydro Review conducted a survey of leaders in the hydro generation industry...

EPRI's Pumped Storage Planning and Evaluation Guide
EPRI's Pumped Storage Planning and Evaluation Guide was published in 1990. The Guide provides step-by-step procedures to: (a) evaluate pumped-storage operation in a utility...

Small and Low Head Pumped Storage Projects
With the recent completion of several very large pumped storage projects, the perception of a hydroelectric pumped storage project in some power industry circles may be that of a project...

Small Hydro Site Ranking, Cost Methodology and Program
The user-friendly micro-computer program SHYDRO for costing small hydro has been prepared for the government of Canada and is available in the public domain. SHYDRO was initially applied...

Evaluating Hydro Project Benefits with the POWRSYM Production Cost Model
The contribution that a hydro peaking project or pumped-storage project makes to reducing system operating costs can be determined only by modeling the project's operation...

Dewatering Using a Floating Bulkhead Proves Flexible, Reusable and Cost Effective
Going beyond a traditional bulkhead dropped in place with a barge crane or crane hoist, a steel floating bulkhead was conceived to dewater powerplant intakes, gated spillway bays or outlet...

Probabilistic Scheduling of Cavitation Repairs
The probabilistic nature of maintenance scheduling is exemplified by operating histories and conditions which vary from unit to unit. Typically, an operator must decide whether to repair...

Hydro Plant Modernization and Uprating
The paper suggests that the method to achieve desirable hydropower benefits at costs lower than for new thermal projects, is through systematic modernization and upgrading of older hydro...

Dillon Hydroelectric Project Performance Versus Expectations
The Dillon Hydroelectric Project was commissioned in 1987. Design and construction are briefly described; plant availability is compared with design expectations; and maintenance costs...

Direct Load Cell-Based Weighing Lysimeter System
A low-cost weighing lysimeter system is described which is capable of measuring evapotranspiration with an accuracy of 0.05-0.10 mm. A two-lysimeter system with electronic data logger...

Adopted Drip Irrigation Technology for Developing Countries
Two low cost drip irrigation systems are presented. Even though the uniformity of these systems is not as high as the conventional drip systems, the initial and operating costs of the...

Planning and Organization to Control Liabilities and Insurance Cost
The liabilities and insurance cost associated with construction projects can be considerable. Activities that are performed which carry extensive liability exposures with limited controls...

Who Pays for the Unexpected in Construction? A Heavy Construction Contractor's Viewpoint
The complex question of who pays for the unexpected in construction is analyzed using several examples from experience. In addition to the unexpected being due to subsurface conditions,...

Who Pays for the Unexpected in Construction?
Unexpected events of major concern result from voluntary risks taken by one or more of the parties to a construction contract. The party taking the risk should reap the reward or pay the...

Automation of a Truck-Mounted Drill Rig
Truck-mounted drill rigs used for soils properties investigation, foundation evaluation, ore exploration, and producing monitor and water wells typically require, because of their weight,...

Integrating the Processes of Design, Scheduling, and Cost Estimating Within an Object-Oriented Environment
This paper describes the conceptual design of several processes for performing the stages of building design, construction scheduling, and cost estimating within an object-oriented environment....

Knowledge-Based Construction Scheduling Support
Research efforts are underway to develop enhanced tools for construction scheduling support. Current work includes the development of an advisor system for considering schedule weather...

Implicit Design Knowledge and its Impact on Cost Estimating
Construction cost estimating experiences negative impacts due to a design-construction gap created by the fragmented nature of the AEC industry. Most of the design knowledge and data that...

Value Engineered Construction
Value Engineering provides us with a systematic approach for looking at design and construction projects with an eye to cost cutting while maintaining or improving value, however value...

Determining the Optimum Level of Quality Management Effort
Quality management is an essential factor in construction project success. Determining the appropriate level of quality management effort remains a challenging managerial decision. A discussion...

 

 

 

 