City of Sedona Wastewater Reclamation Plant Upgrade: How to Teach an Old Dog New Tricks
(No paper) The City of Sedona's early 1990's wastewater treatment plant was difficult to control, prone to plant upsets, near capacity and often experienced on-site sewage spills. Additionally,...

Water Resource Systems and Modeling of the Lower Virgin River Using EXCEL
(No paper) The first objective of this study was to determine the availability of water at the confluence of the Halfway Wash and the Virgin River and to simulate the diversion of river...

Evaluating Alternatives for Capacity Expansion: Ensuring Reliable Water for the Portland, Oregon, Area
(No paper) The Portland Water Bureau is currently evaluating its water supply expansion alternatives. Like many water bureaus responsible for supplying water to both in-city customers...

Comparison of Complete Modeling/Simplified Modeling of Zaragoza City Water Supply Network
(No paper) Zaragoza is a Spanish city with 600.000 inhabitants and a water supply network of 900km long. The Council technical services uses a Microstation based GIS, GRED, for network...

River Replication
In 1997 a U.S. patent was granted to the U.S. Army Corps of Engineers for a new applied engineering tool and methodology called micromodeling, which uses a small-scale physical model to...

Sizing Up Seismic Bearings
Today in the U.S., there are two general technologies available to protect new and existing bridges from the damaging effects of earthquakes. One type, seismic isolation bearings, provide...

An Olympic Endeavor
Although some of the venues for the 2002 Winter Olympic Games in Salt Lake City, Utah, already exist, three sites in particular are either being built from scratch or will replace outdated...

Towering Over Xiamen (Available in Structural Engineering Special Issue only)
Composite structural systems are rapidly becoming the preferred choice for high-rise buildings, due to their high strength and stiffness, large ductility, and convenient, economical construction....

GIS Modules and Distributed Models of the Watershed
Prepared by the Task Committee on GIS Modules and Distributed Models of the Watershed of ASCE. This report guides professionals in selecting the mostadvantageous...

Exacting Renovation
In the heart of Greenwich Village a building that would typically be demolished given its current condition has been saved and restored with careful engineering and a precise demolition/construction...

Pipeline Safety, Reliability, and Rehabilitation
This proceedings, Pipeline Safety, Reliability, and Rehabilitation, consists of papers sponsored by the Pipeline Division of the American Society...

Who Provides Inspection
With the increasing interest in the design-build project deliver system, the decision of who should be responsible for quality assurance/quality control has become a complex one. To assist...

Newsletters That Deliver
A newsletter consultant and business manager for a small engineering firm explains how to create an effective newsletter for new and potential clients. Among the necessary steps are establishing...

Tall Order
Successive earthquakes have damaged the 32-story, 460 ft (140 m) tall Los Angeles City Hall, built in 1926. Masonry infill and concrete walls have cracked, and the terra cotta cladding...

Managing the Megaproject
The Mon/Fayette Expressway and Southern Beltway will link Pittsburgh, Pennsylvania and Morgantown, West Virginia via a 104 km, $3.5 billion Y-shaped highway. With the project split into...

All Eyes on I-15
The largest single highway construction contract in United States history is currently underway in Salt Lake City, Utah. The Utah Department of Transportation's innovative...

Electrical Explorations (Available in Geo-Environmental Special Issue only)
Recent advances in state-of-the-art, relatively fast, two- and three-dimensional electrical resistivity imaging (also called profiling or tomography) have offered a new view on subsurface...

GIS Paves the Way
The National Environmental Policy Act (NEPA) of 1969 requires an environmental impact assessment study for all Federal-aid transportation improvement projects. NEPA studies evaluate potential...

Predicting with Precision
In many urban areas flood prediction systems are inadequate. Most rely on networks of widely dispersed rain gauges that often fail to provide sufficient geographic coverage to characterize...

The Ultimate Challenge
The U.S. Department of Energy (DOE) has spent $2 billion and more than a decade studying the feasibility of constructing a nuclear waste repository inside Yucca Mountain in Nevada. The...

 

 

 

 

Return to search