An Integrated Model for Fate and Transport of Oil in Rivers
An integrated oil spill model for microcomputers is developed for simulating fate and transport of spilled oil in rivers. This model can simulate the oil slick transformation in transient...
Numerical Model Development for Oil Spill Dispersion into the Marine Environment
A 3-D oil spill model was developed to study the behaviour of heavy spilled oil in the sea. The model could describe the behaviour on the spilled oil on the sea surface, throughout the...
Sediment Modeling of Dam Removal Alternatives, Elwha River, Washington
The new version of the U.S. Army Corps of Engineers (ACOE) 1-Dimensional sediment transport model, HEC-6 'Scour and Deposition in Rivers and Reservoirs', was...
Data Acquisition Systems for IBM Compatible System
Portable data acquisition systems composed of IBM compatible PC/XT/AT computers and analog to digital conversion cards can be configured with relative ease. These systems have the flexibility...
Computerized Data Acquisition for an Undergraduate Hydraulics Laboratory
Basic hydraulics principles and the operation of certain hydraulic systems can be effectively demonstrated with the aid of relatively inexpensive data acquisition and analyses systems....
Use of Electronic Microprocessor-Based Instrumentation by the U.S. Geological Survey for Hydrologic Data Collection
The U.S. Geological Survey is acquiring a new generation of field computers and communications software to support hydrologic data-collection at field locations. The new computer hardware...
A Knowledge-Based System for the Environmental Design of Waterways (ENDOW)
Knowledge-based software systems accept problem descriptions from users and apply logic in order to generate a solution or solution set. These systems function over very narrow problem...
LISP or CLIPS: Selecting an Expert System Tool in Hydraulic Engineering
The transfer of Artificial Intelligence(AI) technology from the research laboratories to the scientific and engineering environments has been made possible by phenomenal advances in computer...
A Study of Friction Factor for Flow in Gravel Bed Channels
For many years practicing engineers have faced the problem of predicting the resistance to flow in channels with rough surface. Flow in channel is a complex interaction between surface...
Fluid Mud Problems in Lakes, Reservoirs and Detention Ponds
An experimental study of wind induced surfacing of fluid mud bottoms in shallow water has been conducted. The experiments involved a channel placed within a wind tunnel, where a two-layered,...
Calibration of Beni-Mazar Movable Bed Model
A sand-bed model representing a reach of the Nile River was constructed to study alternative solutions to maintaining the navigation channel. Flume tests were carried out first to determine...
Legal Principles and Theories
Legal issues are intertwined with all aspects of the technical considerations relating to temporary structures. This paper presents an introduction to the legal theories which relate to...
Development of Standards for Slipform & Jumpform Works
Review of past work indicates substantial effort has been made to publish construction standards and guidelines for slipforms but published material pertaining to jumpforms is scarce....
Temporary Structures for Protection and Access
Temporary Structures in Construction Projects (TSC) are utilized for three (3) purposes A. Support (of the structure being built or adjacent structures or utilities) B. Protection (of...
Who Pays for the Unexpected in Construction: The Geotechnical Contractor's Point of View
Unexpected conditions are inherent in most construction projects and often lead to claims and legal action. Contract risk avoidance language force owners, engineers and contractors to...
Who Pays for the Unexpected in Construction?An Architect's Viewpoint
As an Architect, who in the first instance is contractually obligated to address the full range of design discipline services, the question of 'who pays for the unexpected...
Who Pays for the Unexpected in Construction
The problem of who pays for the unexpected in construction is discussed in relation to the testing and inspection of construction materials. Laboratory is often blamed for poor construction...
Construction Product Performance, The Unexpected
Efforts made in the construction, industry to increase the quality of the constructed facility through the development of new materials and systems and through the reduction of labor intensive...
Animation of Automated Space Construction
This paper presents a discussion of Three-Dimensional Computer Animation as applied to the evaluation of Lunar/Mars construction. A number of applications for this type of tool are introduced....
Construction and Robotics: Problems and Solutions
The role of robotics in construction, and the role played by construction engineers (CE's) is placed in perspective. Robot development, like machine manufacture, has always...
Return to search