Project Management for the Upper Harlem Electrification Project
The Upper Harlem Electrification Project consists of a 28 mile extension of 700 V. D. C. under-running third (current carrying contact) rail electrification from North White Plains, New...

Philadelphia Center City Commuter Connection
The Philadelphia Center City Commuter Connection, a 330,000,000 urban transit project has been completed on schedule within a budget variance of 2% of the estimated cost. This is an accomplishment...

Budget and Schedule Control?The Critical Issues
The increase of activity together with often difficult budgets and schedules in busway and rail transit projects since 1960, has made the processes of project control for these projects...

Probability-Based Load Criteria for Structural Design
Load criteria for use in limit states design of structures are developed using probabilistic methods. Statistical data on load and strengths are integrated by the reliability analysis...

Transit Operations Input to Project Planning and Design
The rationale for most public transportation projects is a requirement imposed on the operating agency by an existing or expected service demand. These expected operations may be intended...

Aesthetics and Design of Prestressed High-Rise Buildings
This paper will address the aesthetics, economic and construction-related advantages of prestressed concrete for high-rise buildings, with an emphasis on the South-East Asia region. While...

Bentonitic Slurry in Constructing Drilled Piers
Bentonitic slurry is employed extensively in the construction of drilled shafts. While serious problems can occur, evidence is presented to show that the proper use of slurry will lead...

Installation of Category I Caissons
Founding a proposed safety-related Category I structure of a nuclear power plant on rock socketed caissons necessitated using precision installation techniques. These techniques were chosen...

Observations on Load Tests for Drilled Shafts
This paper focuses on three specific areas pertaining to load tests for drilled shafts: 1) basic considerations and load testing procedures, 2) interpretation of uplift load test information,...

Quality Assurance/Quality Control; Case Studies?Introduction
The report emphasizes several requirements for quality management: a. The need for a knowledgeable field representative, preferably the resident engineer. This person must be familiar...

Quality in the Constructed Project: A Workshop Report
In the fall of 1984, ASCE conducted a workshop to determine what actions are necessary to improve quality in the constructed project. The engineering segment of the two-day meeting included...

Quality Management in the US Army Corps of Engineers: An Evaluation
Quality management programs are employed to assure the achievement of specific standards of performance. In the construction industry, quality management personnel face common problems...

The Role of the Quality Assurance Management on a Large Commercial Project
The role of the quality assurance manager on a high rise project being built on a tight time schedule is a challenging and diversified assignment. It is made especially difficult when...

Construction Management: Dallas North Tollway Project
This article will attempt to illustrate the importance of flexibility of the design and construction inspection process to insure the project is constructed within the time and budget...

Managing Quality into the Workplace
In February, 1983, the author's organization began a process designed to enhance attitudes about quality in every individual member of the organization. The process requires...

Snow Management at Ski Areas: Hydrologic Effects
Several types of snow management are practiced at downhill ski areas. Each of these activities has a variety of hydrologic consequences. The extent to which these management practices...

Closed Negotiations?Out with the Poker Players
The paper describes the closed negotiation process employed by one owner/client, the U. S. Army Corps of Engineers, in procuring firm, fixed price design service contracts. Although not...

Avoiding Lengthy and Costly Litigation by Negotiating Alternative Dispute Resolution Methods
A 'hot issue' in the construction industry today is the negative aspects perceived from wide arbitration use over the last 15 years. Although hearings usually...

Techniques of Negotiation
Three primary qualities are necessary for effective negotiation: knowledge, attitude, and skill. The author's firm has successfully used a negotiating team approach. This...

Embankment Seepage Control Design and Construction
For seepage control features of embankment dams, design criteria and construction practice is reviewed as it is reflected in the experience of the U. S. Army Corps of Engineers. The generally...

 

 

 

 