Analysis of Hydropower Cost Adjustments in the Southeast
This paper consists of: (1) an analysis of the current cost sharing for hydroelectricity production arrangements for the Federal projects currently classified as those whose electrical...
The Diamond Fork Power Development Experience
Federal water development agencies are, to varying degrees, currently seeking financing partnership arrangements with states and other non-federal entities for up-front construction and...
Financing the Town Bluff Hydropower Project
The Town Bluff Dam Hydropower Project is the first new Federal hydropower project to be completely financed by a non-Federal entity where all of the construction funds would be provided...
A Cost-Sharing Alternative for Federal-Private Water Projects
A proposed cost-sharing alternative for financing of a joint Federal-State multipurpose water project is presented. The philosophy of recent and present Federal administrations on non-Federal...
Eminent Domain Under the Federal Power Act: Use by Private Developers to Acquire Small Sites
From the first reported case in 1922 (Alabama Power Co. v. Gulf Power Co. , 283 F. 606 (D. Ala. 1922)), through 1982 (Greenup County By and Through Ousley v. Utilities Comm'n...
Commensurate with the Scope of the Project: Where Does the Project Environment End?
This paper seeks to contribute to a common understanding by considering the definition of project scope in the context of the Federal Energy Regulatory Commission regulations governing...
Checking Turbine Performance by Index Testing
This paper discusses an index testing procedure used by TVA for measuring performance levels of its hydroelectric units. It also describes a current program for retesting generating units...
New Concepts for Prelininary Hydropower Design
Hydropower generation on steep mountainous streams where storage is impractical can usually be made economical if: the flow duration curve shows sufficient energy available in the high...
Kinetic Hydro Energy Conversion System Study
In early studies conducted at New York University (NYU) at the request of New York Power Authority (NYPA) a number of conclusions were reached regarding the resource and the types of kinetic...
Solar Ponds for Power and Water Quality Control
The status is provided on a solar pond test project in which the Bureau of Reclamation is involved in a cooperative effort with UTEP (The University of Texas at El Paso), Bruce Foods Corporation,...
The PowerBarge?Portable Hydro for the Third World
The PowerBarge concept consists of a floating intake, siphon penstock, and floating generating station for use at new or existing low-head dams. Apart from access, mooring facilities,...
Blue Marsh?A Modular Hydroelectric Project
The Blue Marsh Hydroelectric Project will be the first complete application of concepts developed in several research studies of modular hydroelectric power plant components. The Department...
Development of the Standardized Francis Turbine
Initial machine selections to address higher head sites included small custom Francis turbines and standard pumps running in the turbine mode. As the former proved too costly and the latter...
Computer Aided Design of Small Hydro Turbine
The paper discusses a system for producing custom designed turbines which are attractive in price and delivery, retaining the advantages of customization. A computerized program is being...
Observations and Experiences of Bulb Turbines
This article gives a short historical review of the introduction, construction and development of bulb turbine plants in Sweden. The article relates some of the experiences of the designers,...
Optimization of Low Head Hydro Equipment
In this paper, we will limit our purpose to the presentation of the different types of turbines that CE/Neyrpic proposes for low head power plants, for run of the river operations. We...
Small Kaplan Versus Tubular and Francis Turbines
Mossefossen Power Plant is situated in the centre of the small town Moss in the southern part of Norway. Water flows from an existing dam through a 9 m**2, 175m long tunnel to the powerhouse...
Design Criteria for Generators in Low-Head Hydro-Power Plants
Principal characteristics and design features of such generators are discussed and options and preferences in their selection mentioned. Effects on inertia constant, efficiency, reactive...
Index Testing?Relative Turbine Performance
The Index method of testing hydraulic turbines consists of making a test in which the value of power output and head are measured and in which the quantities of water and velocity head...
Interchangeable Runners Can Increase Energy Output
Interchangeable turbine runners can be used to increase energy generation at some hydroelectric power sites. Two different turbine runners can be designed for different design heads or...