Groundwater Basin Storage in Southern California
The feasibility of implementing a groundwater storage program in the Chino Groundwater Basin (Chino Basin) to increase the firm yield of the SWP (California State Water Project) is considered....
The Present Status of Application of the Plastic Concepts in Structural Design
The different approaches of recognizing plastic behavior in the design of steel structures are reviewed and the design requirements that assure successful utilization of this behavior...
Testing for Salt Damage
Salts used to melt snow can contribute to deterioration of concrete structures. Various tests were used to determine the extent of damage in two structures in Rochester, N.Y. One is an...
In-Plane Composite Drains
Drainage of water from outside basement walls, behind retaining walls, or highway cut or fill slopes, has long been a problem. A common solution is the aggregate drain. Often, installation...
The New Art of Structural Engineering
Exerpt from
Engineering Mechanics in Civil Engineering
The principles of engineering mechanics and the application of these principles to civil engineering problems cover a broad spectrum of topics ranging from theory to practice. These proceedings...
Government Agency Perspective on Standard for Drilled Shafts
Relative to the proposed ASCE standard for Design and Construction of Drilled Shafts, the Tennessee Valley Authority (TVA) would be considered an 'owner'. However,...
Computer Aided Design of Reinforced Concrete
An interactive computer-aided design (CAD) program for the design of reinforced concrete members is herein described. The program, called ECPRS, designs reinforcement and performs all...
Dredge Spoil Disposal Predictions and Performance: A Case History
A 146-acre dredge spoil disposal facility was constructed in Baltimore Harbor that received 3. 4 million cubic yards (2. 6 million cubic meters) of dredge spoil generated from construction...
Perspectives on Modelling Consolidation of Dredged Materials
The physical and mathematical aspects of this problem are highly nonlinear and material-property relationships extend beyond the scope of standard geotechnical engineering. The potential...
Sedimentation and Self Weight Consolidation of Dredge Spoil
Test results suggest that self weight consolidation begins when an interface forms in the settlement column and the slurry reaches a critical concentration as a result of the solid particles...
Dredged Slurry Stabilization for Seagirt Marine Terminal
The Seagirt Marine Terminal is constructed on reclaimed land on dredged spoil from the I-95 Fort McHenry Tunnel in Baltimore, Maryland. Three stabilization procedures considered applicable...
Prediction of Viable Tailings Disposal Methods
A sand-fines-water diagram is proposed to analyze and describe slurries composed of coarse and fine particulate matter. The diagram can be used to predict and plan disposal methods for...
Pavement Recycling: Stopgap or Remedy?
Recycled pavements cost less than new asphalt concrete overlays, but no long term data has ratified how recycled pavements' strength and durability compare to virgin material....
Selecting an Economical Water Main Rehab
Many miles of aging water mains exist with carrying capacities that are less than half of what they were when new. Engineers must, therefore, stretch every dollar to eliminate deposits...
Wetlands Development in Moderate Wave-Energy Climates
For the last three years springs of Spartina alterniflora have been planted on portions of Theodore Island, a dredged material island in Mobile Bay, Alabama. The purpose of the planting...
Monitoring of an Ocean Dredged Material Disposal Site
The Tampa Harbor Project involves deepening and widening approximately 50 miles of existing shipping channel in Tampa Bay, Florida, with the removal of approximately 70 million cubic yards...
Thalweg Disposal: Demonstration of an Alternative
Disposal of dredged material in the main channel, or thalweg, is an alternative disposal option for maintenance dredging. The material dredged from the Upper Mississippi River is clean...
A Methodology for Open-Water Disposal Site Selection
Pascagoula, Mississippi, is the major industrial region in coastal Mississippi. The existing project, completed in 1965, provides for waterborne transportation from the Gulf of Mexico...
Charlotte Harbor Beach Nourishment
The project consisted of dredging approximately 300,000 cubic yards (229, 380 cubic meters) of material, utilizing a seagoing hopper dredge, from the entrance channel of Charlotte Harbor,...