Devil Canyon Powerplant Enlargement Project: Electrical Design Problems and Challenges
Devil Canyon Powerplant is a hydroelectric plant facility of the huge California Water Project. This powerplant is located 5 miles north of San Bernandino. It is currently being enlarged...
Critical Features of Custom Design Hydro Gates
Large hydro gates are custom designed to suit each particular installation. To prevent overlooking a feature that could lead to future problems, a check list of the numerous features should...
Crest Gates Design for Upper Mechanicville
This paper describes the design of flap-type spillway crest gates for the Upper Mechanicville Project, located on the Hudson River near Mechanicville, New York. These gates are being provided...
Oil Hydraulic Design for Turbine Control
The paper addresses three areas of Oil Hydraulic Design for Francis and Kaplan Turbines: smart accumulator condition sensors, high flow servo logic, and high pressures Wicket Gate cylinder...
Considerations to Be Taken in the Design of Speed Increasers for Hydroturbine Service
The paper discusses the incorporation of a speed increaser specification that is primarily functional yet one that will address the cost, reliability, efficiency, and life requirements...
Vibration Problems of Penstock Piping for a Vertical Tubular Hydraulic Turbine
Excessive vibration amplitudes were experienced in the vertical gated tubular units at the Great Falls Hydroelectric Project located in the City of Paterson, New Jersey. Vibration amplitude...
Turbine Runner Procurement for the Robert Moses Niagara Power Plant Upgrade
Procurement of the new runners involved the selection of two manufacturers who have entered into a design competition in which competing models will be tested in an independent hydraulic...
Design Data of Kaplan and Bulb Turbine Units
Some basic statistical data covering geometrical and energy parameters for Kaplan and bulb turbine units are presented. These data are further compared as specific rations for both units,...
Computer Aided Design of Small Hydro Turbine?Phase II
Ateliers Bouvier have been expanding the use of its computer aided design (CAD) system during these last four years, and the aim of this paper is to present some additional aspects of...
Design and Efficiency Testing of a Cross-Flow Turbine
An inexpensive American-made cross-flow turbine was designed, manufactured, and installed at a remote run-of-river site in Northern California. The 400 kW unit includes an innovative automatic...
Nanpil River Hydropower Project
The Nanpil River Hydropower Project is located on the island of Pohnpei in the Federated States of Micronesia, East Caroline Islands located in the Pacific Ocean. The project consists...
Case Study in the Rehabilitation of a Pumped/Storage Installation - Salina Powerhouse Grand River Dam Authority
This paper presents a specific case study in the rehabilitation of a pump/turbine for the Grand River Dam Authority at its Salina plant. The study addresses problems such as cavitation...
Devil Canyon Powerplant Enlargement
This paper presents the design and construction aspects of the enlargement of the existing Devil Canyon Powerplant from 120 MW to 280 MW. Subjects covered include site geology, powerhouse...
Visualization of Flow Phenomena in a Hydraulic Turbine Based on 3D Flow Computations
The fluid flow in a Francis turbine has been analysed theoretically. Advanced techniques have been used for both the flow calculation and the presentation of the results in order to clarify...
Tarbella?Third Extension Project Units 11 to 14: 440 MW Francis Turbine Design
At Tarbela Dam in northern Pakistan, the Third Extension Project, units 11 to 14 of 440 MW each, is presently under construction. When completed in 1992, the multipurpose hydro-irrigation...
Digital Data Acquisition and Performance Testing of Hydroelectric Equipment
The U.S. Army Corps of Engineers Hydroelectric Design Center has elected to use digital data acquisition methods when conducting performance tests of hydroelectric units. Transducers have...
Renewal of the Burt Dam Generating Station
The present redeveloped hydro facility operates as a 300 kW run-of-river station automated by a head pond level controller which adjusts turbine setting to match available river discharge....
Turbine Conceptions for Low Heads and Their Application in US Hydro Power Stations
To improve the feasibility of small power plants standardized units were developed. The bulb turbine technology as well as the pit-type conception improve the feasibility of larger plants....
Foundation Engineering
Current Principles and Practices
The proceedings of the 1989 ASCE Foundation Engineering Congress (entitled Foundation Engineering: Current Principles and Practices) address advances in the state-of-practice and in research...
Building A Better Wetland
Nouri described an engineering plan designed for the National Audubon Society to restore the Ballona Wetlands of southern California, which has been severely degraded by population growth,...