The Race for Smart Cars
Prendergast describes the technological elements involved in Intelligent Vehicle/Highway Systems (IVHS), current programs in Europe, Japan and the U.S. aimed at implementing IVHS systems,...

Screaming Structures
As any designer of roller coasters will tell you, civil engineering principles put the thrills and screams into roller coasters. There are two basic differences between roller coaster...

Creative Application of Materials Engineering
Society's demand for an aesthetically pleasing and safe constructed environment, along with the construction industry's higher and higher costs, dictate that...

Affordable Housing
a Challenge to Civil Engineers
This conference proceedings, which consists of 25 papers presented at the National Conference on Affordable Housing held in Miami, Florida on December 6-8, 1989, discusses ways that the...

Getting the Most From Engineering Consultant
The Los Angeles County Transportation Commission ('LACTC') has embarked upon a 150 mile rail transit construction program within Los Angeles County. A program...

Highway Project Constructability
Results from on-going research into highway project constructibility are discussed. Research objectives and methods are outlined. Prime constructibility objectives are presented along...

Project Constructability?A Contractor's View
This paper addresses a contractor's view of what can be done to improve project constructibility from the design through the actual construction of the project. It addresses...

Specification as a Requirement for Hot Mix Asphalt
A brief description of the current national research programs that affect the development of specifications is included in this paper. Elements of the Strategic Highway Research Program...

Specifications and Constructibility
The article discusses these and other aspects of the subject, including training programs for inspectors and project managers, research/development and pilot testing of new products, methods...

Utilization of Specifications
Project specifications need to be practical, enforceable, and above all must be clear and specific enough to enable any competent builder to understand them, bid on them and carry them...

The Cost of Quality: A Management Tool
In design and construction of engineered facilities, the cost of quality is a major cost item; perhaps exceeding one fourth the total installed project cost. A simple, flexible Quality...

Issues in Computer Based Design/Construction Integration
Design and construction processes are widely regarded as too splintered for industry effectiveness. By improving communication and process integration, reduced costs and improved facilities...

Effectiveness of Computers in Construction Execution
Although the effectiveness of computers in construction control during execution has been shown in several case studies, their use is largely made for planning functions. Also, their use...

Real-Time Project Tracking
Too often project tracking is based on a job costing program which charges costs to the project based upon invoices from vendors and payrolls of employees. The information obtained from...

Why Not a Microcomputer at Each Construction Site?
This paper first considers some of the issues concerning when (and even whether) such an idea is practical. It then looks at how to increase the likelihood of obtaining the desired results....

AEC Experience with Expert Systems in Construction
The application of expert systems in the construction industry requires the use of general-purpose computers, such as microcomputers, minicomputers, and mainframes. The use of commercial...

U.S. Army Corps Engineers Construction Contract Claims Guidance System
Researchers at the U.S. Army Construction Engineering Research Laboratory (USA-CERL) have been developing an expert system called Claims Guidance System (CGS) to provide claims analysis...

Knowledge-Based Construction Project Planning
This paper describes CONSTRUCTION PLANEX as a prototype of a knowledge-based construction process planner. CONSTRUCTION PLANEX is a knowledge-based system that generates project plans...

Integrated Automation for Site Work
Technologically, computer integration can be built around four component systems; (a) a computer system to maintain unified data and control real-time operations, (b) a metrology system...

Real-time Monitoring of Heavy Equipment in Open Pit Mines
This paper reports on a system with local intelligence to interpret on-board signals. Existing sensors, pressure switches, warning lights, relays, and on-board monitoring systems provide...

 

 

 

 

Return to search