Asphalt Pavement Modifiers
Modifiers or additives to asphalt concrete pavements are being researched or marketed by many major chemical firms. Modifiers or additives are used to stiffen the asphalt in hot weather...

Mainframe Software on Micos�Finally?
Now that sophisticated analyses run on microcomputers, engineers should consider converting software originally written for mainframs on their micros. Tools for transferring software can...

CAD Goes into Analysis
In the past, computer analysis of a design was always a separate and distinct step from CAD. Now, an increasing number of systems are combining the two. One system, SSCAD, allows the engineer...

Expert Systems Enter the Marketplace
Civil engineering expert systems (computer programs that incorporate some of the decision-making capabilities of the top experts in a given subdiscipline) are beginning to come on the...

Building with Software
Project management has become a more precise art now that computers are on the construction scene. Scotsman Mfg. Corp. computerized its manual CPM techniques for erecting modular structures,...

Terzaghi Lectures
1974-1982
Sponsored by the Executive Committee of the Geotechnical Engineering Division of ASCE. This Geotechnical Special Publication contains eight lectures...

The Use of Cone Penetrometer Testing to Investigate Sand Fill Subsidence Beneath Highways
During construction of Interstate I-10 between Baton Rouge and LaPlace, Louisiana, highly organic swamp deposits were excavated and replaced with hydraulically pumped river sand. The main...

Comparison Between In-Situ Test Results
Penetration tests provide a means of obtaining data from which estimations can be made of the bearing capacity, settlement and liquefaction potential of the soils tested. Empirical formulae...

North American Standard Penetration Test Practice: An Essay
The Standard Penetration Test (SPT) is the in situ mechanical soil test most used by North American geotechnical practitioners. The equipment and procedures of the test have periodically...

Designing for Maintainability
Inspection and maintenance guidelines are unavailable for many buildings. Building owners seldom have the benefit of such information because buildings are often considered passive systems,...

Construction by Computer
Olympia & York, the developers of the 8 million sq ft World Financial Center in lower Manhattan are using a computerized scheduling system to keep the flow of materials into the...

Land Disposal Construction, Monitoring and Closure
The continuous generation of hundreds of thousands of gallons of hazardous wastewater and waste process solutions each year at an aerospace development and assembly plant at Lockheed Missiles...

Lessons Learned Implementing the Minimum Technology Guidance for Landfills
The 'Minimum Technology Guidance on Double Liner Systems for Landfills and Surface Impoundments' issued by the Environmental Protection Agency (EPA) in May 1985...

Safety Aspects of Sulfide and Corrosion Studies (abstract)
An overview of the hazards involved in performing sulfide and corrosion studies in sewage treatment and collection systems is presented. Important factors which should be recognized in...

Hydroelectric Program for Development in Mexico
This work deals with the process at present followed in Mexico for the development of hydroelectric projects. Then, the participation of hydroelectricity in the electric sector is given...

Small Hydro is Very Rarely Typical
Engineering design of a small hydro project is often considered to be straightforward. Many potential developers assume that the engineering effort can be reduced to 'typical'...

Hydropower on the Arkansas?A Non-Federal Development
Only two of the eleven navigation locks and dams in Arkansas were initially constructed with hydropower facilities. In 1980, Arkansas Electric Cooperative Corporation (AECC) filed preliminary...

The Rx for Relief from Equipment Failure
A predictive maintenance program was developed for a treatment plant with a large number of pieces of critical mechanical equipment. Using an inexpensive, portable vibration meter, data...

Toe Drain System?Barr and Milton Reservoirs, CO
The purpose of this paper is to describe the design and construction of toe drains in difficult soil conditions for two 70 plus year old dams in Colorado using a unique toe drain installation...

Design and Construction of TCE/PCE Removal Facilities
This paper presents a review of the design and construction of a facility in Arcadia, California, to remove trichloroethylene (TCE) and tetrachlorethylene (PCE) from groundwater. The City...

 

 

 

 