Geotechnical Notes on the Effects of Mexico's 1985 Earthquakes
The present notes briefly describe the most relevant effects of the September 19 and 20, 1985 earthquakes on shallow and deep foundations used in Mexico City, which is located at about...
Effects of the 1985 Earthquake in Lazaro Cardenas, Mich.
An account is presented of a geotechnical survey made shortly after the major earthquake of September 19, 1985 (magnitude 8. 1) at the industrial port of Lazaro Cardenas in the state of...
Analyses of Foundation Failures
During the earthquake of September 19th, 1985, many buildings tilted and underwent settlements, sometimes of very large magnitudes. This paper describes and analyzes these settlements....
Soil-Structure Interaction in Mexico City During the 1985 Earthquakes
The effects of the flexibility of the soil and the foundation on the seismic response of structures, by opposition to clear foundation failures, cannot be easily identified from a simple...
Seismic Design Criteria for Foundations on Control Piles
Control piles have been widely used in Mexico City for underpinning buildings with excessive settlements caused by the consolidation of the soft clay deposits, and as a foundation solution...
Performance of Steel Structures
A description of the various types of steel structures built in Mexico City is made, including comparisons of the older types of steel construction with more modern buildings. Performance...
Summary of the Effects of the 1985 Mexico Earthquake to Power and Industrial Facilities
A major industrial area and two power plants are near the epicenter of the Magnitude 8. 1 Mexico Earthquake of September 19, 1985. All investigated facilities are modern, generally well...
The Impact of the Construction of Public Works by the Earthquakes of September 1985
The earthquake of September 19th and 20th, 1985, is discussed with emphasis on general damage. The works of the Head Office of Urban Services is described in relation to emergency response....
Stopping Seepage
The Navajo Dam in New Mexico has major seepage problems. The Bureau of Reclamation, which owns the Dam, conducted studies, verified by outside consultants, concluding that the combination...
Transmission Structure Foundation Loads and Performance
Transmission line structures are subjected to unique loading conditions which for the majority of structures results in maximum loads which occur infrequently and act for only short periods...
Construction and Design of Foundations for French Overhead Power Transmission Network
This paper summarizes present conception and design of foundations for 90 to 400 kV overhead lines in France. Firstly principles of geotechnical studies in use are presented: various types...
High Capacity Multi-Helix Screw Anchors for Transmission Line Foundations
Three case history summaries are presented which discuss the siting, design, and construction of towers supported on multi-helix screw anchor foundations in the Virginia Power service...
Settlement of Residual Soils
The method previously suggested by the author in 1977 for calculating settlement of non-plastic to slightly plastic Piedmont Physiographic Region residual soils is reviewed. Additional...
Pressure Injected Footings in Piedmont Profiles
Comparatively little has been published on the behavior of pressure injected footings in the Piedmont residual soils and weathered rocks. It is the purpose of this paper to describe some...
Design of Drilled Piers in the Atlantic Piedmont
The philosophy and methods of drilled pier foundation design in the Atlantic Piedmont are described. Consideration is also given to the unique characteristics of decomposed metamorphic...
Drilled Piers in the Piedmont?Minimizing Contractor-Engineer-Owner Conflicts
Drilled piers are used extensively in the Piedmont Physiographic Region, deriving support primarily from end-bearing on hard rock. Cost extras and contractor-engineer-owner conflicts are...
Dispersive Soil and its Influence on the Design of Reach 1A of the Tucson Aqueduct?Central Arizona Project
An extensive geotechnical field exploration and laboratory testing program was conducted because of dispersive and erosive soils along the alignment of the canal. The canal design was...
The Delineation and Management of Wellhead Protection Areas
The delineation and protection of a management zone around specific wells or wellfields will undoubtedly become more common as the 1986 Amendments to the Safe Drinking Water Act are implemented...
Optimal Process of the Development of the Residential Area on the Coastal Zone
The concentration of population and assets through various types of development in the coastal zone in Japan is progressing rapidly at present. The conditions of the sea environment are...
St. George Harbor?A Berm Breakwater Solution in Alaska's Bering Sea
The berm breakwater concept is based on the premise that locally available materials should be used in breakwater construction to the largest degree possible. By looking at failure dynamics...
Return to search