Sri Lanka's Mini-Hydro Rehabilitation Programme
As part of Sri Lanka's medium term investment programme funded mainly by the World Bank and Asian Development Bank, the British Government's Overseas Development...

Hydro Development on the Huallaga River in Peru
The proposed Chaglla Hydroelectric Project, is located on the Huallaga River in Central Peru, about 300 km north east of Lima. The available gross head of 870 m and regulated flow of 58...

Small Hydro Studies in Northern Thailand
As part of the Thai Government's programme of rural electrification, Balfour Beatty Engineering (BBE) has been assisting the Provincial Electricity Authority (PEA) in the...

Pumped-Storage Project Site Selection
The paper presents a case history in the selection of a site for a large pumped-storage project for Oglethorpe Power Corporation. The case history illustrates how a large number of potential...

Pumped-Storage: An Analysis of Optimal Capacity
This paper presents a systems analysis procedure to evaluate planning alternatives for pumped-storage operated in an existing power system. This procedure can be used by planners and engineers...

Pumped Storage and Compressed Air Storage, A Comparison
Pumped storage hydroelectric power plants and compressed air energy storage (CAES) plants are used for peaking and intermediate duty on electrical utility load systems. In comparing pumped...

New Opportunities for Pumped Storage Projects
A variety of design, economic, power supply, and environmental factors are combining which will bring a resurgence to the interest in developing pumped storage projects in the early 1990's...

Refurbishment and Modernization of Hydro Plants
In order to assemble experiences, settle and systematize the problems connected with rehabilitating and redeveloping hydro power plants and to work out proposals a project titled 'Refurbishment...

Outage Time and Its Effects on Rehabilitation Philosophy ? A Case Study
The Abitibi-Price Paper Mill located in Grand Falls, Newfoundland presently has eight (8) hydro-generating units in operation to assist in offsetting the power demands created through...

Expansion of Three Plants on the Saranac River
The capacity of three cascading hydro power plants, owned and operated by New York State Electric and Gas Corporation on the Saranac River near Plattsburgh, was expanded by a total of...

Selection of Jim Falls Turbine Generators
The selection of the unit configuration for the Northern States Power Company's Jim Falls Hydro Redevelopment Project was based on an extensive evaluation of various turbine...

Hydropower retrofit at the Toledo Bend Dam
Since the early 1970's, the Authorities have been examining the possibility of utilizing sluiceway releases to generate hydroelectric power to meet most of the demands of...

Optimizing Hydropower Potential Using Water Management Techniques
The development of hydropower facilities at existing dams creates an interesting dilemma to both public and private hydro developers: Is the proposed development the best-adapted use of...

Rehabilitation of Existing Hydro, Our Oldest Natural Resource
With renewed interest in hydro, many old sites are being rehabilitated to achieve maximum power output and higher efficiencies. Rehabilitated plants are now performing at optimal levels,...

Federal Vs. Non-Federal Hydroelectric Development
This paper presents the methodology and results of economic and financial analyses that were performed to indicate the optimum size powerplants that would be constructed assuming Federal...

Probabilistic Capacity Value of Nonfirm Hydro Energy
Electric utilities with a predominant mix of hydro generation traditionally apply Energy Planning criteria rather than Capacity Planning criteria in developing their generation resources...

Equipment Selection and Site Optimization Based on Energy Considerations
Most new hydro plants contribute little or nothing to overall system capacity. Therefore, traditional evaluation techniques based on dollars per installed kilowatt have no relevance when...

Economic Analysis Guidelines?Western Area Power Admin
Guidelines addressing methods and procedures for evaluating benefit and cost components of power projects are being prepared for Western Area Power Administration to use in economic analyses...

Actual Vs. Expected Performance of Small Hydro Projects
This paper presents the results of several case studies of small hydro projects that compare the expected performance with the actual performance as measured in terms of energy generation....

Movable Dam?Gate Selection Procedure
Very few new dams are now being considered, particularly for waterpower and even more specifically for low head waterpower in the lower reaches of major rivers. The City of Harrisburg,...

 

 

 

 