Lemon Dam Hydropower Project
The Florida Water Conservancy District (District), the entity responsible for the operation of the dam and for repayment of the costs, had been interested in the hydropower potential of...

Planning and Designing the Powerplant at Stampede Dam
Power development at Stampede Dam was complicated due to the uncertainty about future reservoir operation and the need to design for seismic risk while attempting to minimize overall cost....

Manali Mini Hydro Power Project: A Case Study
The paper describes the various civil, hydromechanical and electrical features of Manali Mini Hydro Power Project which has been set up as a National Demonstration Project. The paper discusses...

Crooke's Falls Small Hydro: A Case History
The paper discusses the background, financing, licensing and other aspects of hydroelectric power plant development at Crooke's Falls, Colorado....

Case Study?Wyre Wynd Hydroelectric Project
To combat rising energy costs, Southwire Company, a manufacturer of wire and cable products headquartered in Carrollton, Georgia, began generating its own electrical power at the company's...

Case Study of Existing Site's Optimum Capacity
A study was performed to determine the optimum additional hydroelectric capacity for installation at an underdeveloped run-of-river hydro site. The added capacity will operate in conjunction...

Non-Federal Development at a Federal Dam: A Case Study
The 2. 8 MW Mt. Elbert Conduit Hydropower Project, developed by STS Energenics Ltd. Inc. , will begin operation mid-October, 1985. The powerhouse has been constructed and the turbine and...

A Review of the Cross-Flow Turbine
The historical development of the cross-flow turbine is briefly presented together with a summary of the well-documented one-dimensional theory. Two-dimensional aspects of runner design...

Dolores Pumped-Storage Unit?A Case Study in Planning
The Durango Projects Office of the U. S. Bureau of Reclamation (Reclamation) conducted a pumped-storage investigation from 1981 to 1983 on a site in southwestern Colorado. This paper describes...

The Sand Bar Hydroelectric Project: A Case History
The Sand Bar project's major features include a reinforced concrete intake structure; 3. 5 miles of twelve foot diameter hard rock tunnel; a reinforced concrete powerhouse...

Economic factors of Hydro Plants Versus Fossil Plants for Load Frequency Control
The purpose of this study was to determine whether hydro plants with Francis turbines or fossil plants are more economical for load frequency control. Using data from the Tennessee Valley...

Financial Engineering for Small Hydropower Development
Despite the current impact of new tax laws, there are some creative approaches that the engineer and banker can use to assist development teams in successfully completing high-quality...

Current Financing Trends in Hydroelectric Development
The paper presents the author's view of current financing trends in the hydroelectric project development industry. These events are described in the context of the author's...

Analysis of Hydropower Cost Adjustments in the Southeast
This paper consists of: (1) an analysis of the current cost sharing for hydroelectricity production arrangements for the Federal projects currently classified as those whose electrical...

Blue Marsh?A Modular Hydroelectric Project
The Blue Marsh Hydroelectric Project will be the first complete application of concepts developed in several research studies of modular hydroelectric power plant components. The Department...

Small Kaplan Versus Tubular and Francis Turbines
Mossefossen Power Plant is situated in the centre of the small town Moss in the southern part of Norway. Water flows from an existing dam through a 9 m**2, 175m long tunnel to the powerhouse...

Rapid Filling of Reservoirs
The rate of filling a reservoir, particularly for the first time, is governed by various factors. While economic considerations may favor rapid filling of reservoir to operational levels,...

More Kilowatts with Less Investment
The paper discusses partial or complete modernization of hydraulic units and/or governing system as a means to increasing profitability. A combination of general and case history applications...

Analysis of Expanding the Wolf Creek Powerplant
The Nashville District, Corps of Engineers, is examining the feasibility of expanding the Wolf Creek powerplant to increase its peaking capability. The economic analysis of peaking expansions...

Rehabilitation of Victoria Dam
Rehabilitation of a 54-year old thin concrete arch-buttress dam was completed without interruption of power generation using pressure injection of an epoxy adhesive. This paper presents...

 

 

 

 

Return to search