Design Criteria for Ferry Landings
This paper describes an ongoing research project conducted by the University of Washington Department of Civil Engineering to develop design criteria for the Washington State Ferry System....

A Removable Submarine Cover for Drydock No. 2 Modernization
In order to provide balanced overhaul capability and flexibility in the 1990's and beyond, the Portsmouth Naval Shipyard in Kittery Maine, a major U.S. Navy submarine and overhaul repair...

Crane Raise with Zero Downtime
Massachusetts Fort Authority (MPA) was faced with a dilemma. Its Conley Terminal tenants needed higher cranes but could not relinquish the cranes for more than a few days at a time. No...

Terminal Asphalt Patching: An Innovative Approach
Asphaltic concrete has dominated the terminal industry as the pavement of choice for years. It is readily available and economical to install but requires considerable maintenance expense....

Solving MWRA's Supply Issues Through Conservation
Facing a supply/demand imbalance where demand was exceeding supply by over 10%, MWRA acted to implement a balanced water conservation strategy. The strategy included leak detection and...

Decision Analysis Model for Well Rehabilitation and Groundwater Development, Moses Lake, Washington
A decision analysis model has been developed for evaluating various well rehabilitation strategies and long-term groundwater development alternatives, as well as various investigation...

When Sewer Rehab Doesn't Stop Basement Flooding
The western half of Wilmette, Illinois, is served by separate sanitary sewers. Constructed in the late 1920's, this separate sewer system was among the first installed in northeastern...

CSO Rehabilitation Strategies for Urban Areas
The USEPA national strategy for reduction of combined sewer overflows places high priority on maximizing the amount of combined wastewater that is captured and treated in the existing...

Planning, Assessing and Implementing Pipeline Rehabilitation Options
The methods of investigation for determining pipeline rehabilitation options for design and construction are directed chiefly toward: a) cost minimization of necessary rehabilitation projects;...

Design Criteria and Specifications for Pipeline Rehabilitation Projects
Pipeline rehabilitation, while not a completely new technology, is nevertheless a fairly recent development, just now coming to the forefront as to common usage. It is not however a fail-safe...

A Chance Constrained Optimization Model Using Kinematic Wave Routing for Stormwater Infrastructure Rehabilitation
A chance constrained optimization model is presented to determine efficient long-term replacement strategies for segments of stormwater drainage systems. The model is multiobjective in...

Water Main Rehabilitation Needs for the 1990's
Distribution systems represent the major portion of water utilities capital assets. There are growing concerns about water quality deterioration within distribution systems, and hydraulic...

A Review of Current UK Techniques for Rehabilitating Water Mains
This paper describes the main techniques used in the UK Water Industry to rehabilitate water mains, highlighting their advantages and disadvantages....

Cost of Rehabilitation of Water Distribution Systems
The Chester Water Authority was established in 1868 and supplies water to residential and industrial customers in three counties in Southeastern Pennsylvania, and in addition, wholesales...

Water Main Rehabilitation Using Silicote Lining
In an attempt to find a cost effective rehabilitation alternative for over 320 miles of unlined distribution water main, the Louisville Water Company has evaluated a new rehabilitation...

Retrofitting Storm Water Facilities for Quantity and Quality Control
Historically, urban storm water detention facilities in the U.S. were first designed, constructed and operated for the single purpose of urban flood control. In the second phase, recreation...

The Potential Fate of Particulate Contaminants from the Rehabilitated Ranger Uranium Mine
In the initial period after rehabilitation of the Ranger Uranium Mine most particulate matter released into Magela Creek will be wash load. 10% of the annual deposits on the backwater...

Standard Methodologies for the Forensic Investigation of Pavements
The high costs of new construction have made the preservation and restoration of existing pavements an attractive alternative to replacement structures. Existing pavements that are to...

Pavement Surface Maintenance: Overview of SHRP H-106 Experimental Installations
The Strategic Highway Research Program (SHRP) is currently conducting an experiment under SHRP project H-106 to evaluate the performance of various materials and procedures used in making...

Bridge Deck Distress and Repairs
The primary cause of bridge deck deterioration are cyclic freeze-thaw exposures and reinforcing steel corrosion caused by the extensive use of de-icing salts. However, there are other...

 

 

 

 