Use of Electronic Microprocessor-Based Instrumentation by the U.S. Geological Survey for Hydrologic Data Collection
The U.S. Geological Survey is acquiring a new generation of field computers and communications software to support hydrologic data-collection at field locations. The new computer hardware...

A Knowledge-Based System for the Environmental Design of Waterways (ENDOW)
Knowledge-based software systems accept problem descriptions from users and apply logic in order to generate a solution or solution set. These systems function over very narrow problem...

LISP or CLIPS: Selecting an Expert System Tool in Hydraulic Engineering
The transfer of Artificial Intelligence(AI) technology from the research laboratories to the scientific and engineering environments has been made possible by phenomenal advances in computer...

Model Studies on Local Scour
In this investigation, the scaling procedure of a scour model in the laboratory has been indicated. The results have been compared with the prototype data....

Fluid Mud Problems in Lakes, Reservoirs and Detention Ponds
An experimental study of wind induced surfacing of fluid mud bottoms in shallow water has been conducted. The experiments involved a channel placed within a wind tunnel, where a two-layered,...

Legal Principles and Theories
Legal issues are intertwined with all aspects of the technical considerations relating to temporary structures. This paper presents an introduction to the legal theories which relate to...

Liabilities in Temporary Structures Failures?Representative Case Histories
Eight case studies involving construction accidents caused by failure of temporary structures are presented. These studies illustrate the oftentimes unintended consequence of utilizing...

FHWA'S Bridge Temporary Works Research Program
The Federal Highway Administration (FHWA) has developed a research program to address bridge falsework design and construction. This resulted from the collapse of the Route 198 bridge...

Permanent Structure as Part of the Underpinning System for Boston's Central Artery
The Central Artery, a major six lane structural steel viaduct, has been one of Boston's most significant roadways over the past three decades. Increasing congestion, accidents,...

Design and Planning of Structural Steel Roll-In
Innovative construction methods were required to erect structural steel inside a 170 foot long box truss over a railroad. The contractor engineered and executed a unique system to roll...

Composite Twin Tub Bridge Erection Intersection of Interstate I-84 and I-94 in Hartford, Connecticut
Curved bridge erection requires detailed preparation by the contractor, plus a sharing of responsibility and liability between the owner, designer of the new structure and the contractor....

Who Pays for the Unexpected in Construction: The Geotechnical Contractor's Point of View
Unexpected conditions are inherent in most construction projects and often lead to claims and legal action. Contract risk avoidance language force owners, engineers and contractors to...

Who Pays for the Unexpected in Construction?An Architect's Viewpoint
As an Architect, who in the first instance is contractually obligated to address the full range of design discipline services, the question of 'who pays for the unexpected...

Construction Product Performance, The Unexpected
Efforts made in the construction, industry to increase the quality of the constructed facility through the development of new materials and systems and through the reduction of labor intensive...

Animation of Automated Space Construction
This paper presents a discussion of Three-Dimensional Computer Animation as applied to the evaluation of Lunar/Mars construction. A number of applications for this type of tool are introduced....

Construction and Robotics: Problems and Solutions
The role of robotics in construction, and the role played by construction engineers (CE's) is placed in perspective. Robot development, like machine manufacture, has always...

Project Management in Areas of Socio-Political Conflict
Project managers routinely deal with project locations which provide adverse environmental conditions. A location in which social and political conflict exists may prove to be extremely...

The Role of Scheduling in Computer Integrated Construction
Engineering and construction firms are showing a growing interest in computer integrated construction because they recognize the increased productivity and quality that can be obtained...

A Framework for Reasoning About CAD Data
A system capable of reasoning about CAD data offers the opportunity to substantially improve a design or a construction plan by providing feedback about an engineer's artifact. This paper...

Requirements of Object-Oriented Databases for Supporting Collaborative Engineering
Object-oriented programming is gradually evolving into a popular and standard paradigm for large software application development. Typical examples include computer-aided design and engineering...

 

 

 

 

Return to search