Hot Mix Asphalt Utilization in Railway Trackbeds
Described herein are the rationales for, descriptions of and evaluations of hot-mix asphalt (HMA) trackbed rehabilitation and construction techniques recently utilized in various classes...
Liability Traps to Avoid
This presentation shows several problem situations and the rules of the game as played by the industry and the courts. It makes three basic assumptions. One, the Materials Engineer knows...
Guidelines for Failure Investigation
The
Box Segmentals: Refining Design
Officials at the Florida Department of Transportation (FDOT), which has built more precast concrete segmental box girder bridges than any other state, say their troubles with that design...
Cautious Risk Taking
Traditionally, the design engineer could bear virtually unlimited liability for design failure. Now he is less vulnerable. The concept is less than 20 years old, but since the early 70s,...
Grouting Trends
The grouting industry is discussed and North American practice compared to European practice. There has been more innovation in this field overseas, but there have also been failures....
Creative Application of Materials Engineering
Society's demand for an aesthetically pleasing and safe constructed environment, along with the construction industry's higher and higher costs, dictate that...
Affordable Housing and the Civil Engineer
The Joint Venture for Affordable Housing (JVAH) Demonstration. Program accomplished the goal and reduced the first time cost of housing by up to 30% through the use of innovative methods...
Specification as a Requirement for Hot Mix Asphalt
A brief description of the current national research programs that affect the development of specifications is included in this paper. Elements of the Strategic Highway Research Program...
Specifications and Constructibility
The article discusses these and other aspects of the subject, including training programs for inspectors and project managers, research/development and pilot testing of new products, methods...
Tunnel Maintenance Operations
Maintenance considerations during both the design and operational phases are very important to good tunnel maintenance. The use of proper materials able to withstand the rigorous environment...
Effect of Planning Errors on Construction Safety
A discussion of the planning phase of the building process associated with all the activities that are accomplished during this phase is presented. The different types of errors that occur...
Who Pays for the Unexpected in Construction?A Contractor's Viewpoint
There are two categories of 'unexpected' conditions inherent in a construction contract. The first are what might be regarded as normal construction risk such...
Developing Performance Concrete and Its Acceptance by Code Authorities
Projects incorporating the benefits of Performance Oriented Concrete frequently occur within the established jurisdictions of specific building departments, highway departments, or other...
The Great Quake: On Site Reports
Written within two weeks of the Oct. 17, 1989 California earthquake, these comments cannot be considered definitive. But they do stress two points: 1) Earthquake codes do work. Buildings...
Specifications for Masonry Structures
Building Code Requirements for Masonry Structures (ACI 530-88/ASCE 5-88) and Specifications for Masonry Structures (ACI 530.1-88/ASCE 6-88) (ACI 530.1-88/ASCE 6-88)
Copublished with the American Concrete Institute (ACI)
Journal of Materials in Civil Engineering
The Journal of Materials in Civil Engineering covers the development, processing, evaluation, applications, and performance of construction materials in civil engineering....
Roller Compacted Concrete II
This volume includes the papers presented at the 1988 ASCE Specialty Conference on Roller Compacted Concrete. Included in the proceedings are experiences of roller compacted concrete dam...
Non-Federal Hydropower Development at Federal Facilities from the Project Developer's Perspective
The City of Santa Clara Electric Department has three small hydroelectric projects in various stages of development at federally-owned facilities. Although all three of the Federal Energy...
Return to search