Upstream Elbow Tubular Turbines for Low Head Applications
This paper presents standardized Neyrpic tubular turbines for Pontook and ByPass Hydroelectric Projects. Upstream elbow turbines have been selected for those sites. In this paper, the...

Optimisation of Bulb and Kaplan Turbine Runners
The paper presents a brief survey of the theoretical method used so far at Turboinstitut Ljubljana for axial runner design and analysis. Theoretically optimised runner is later experimentally...

Bureau of Reclamation Uprating Program
The Bureau of Reclamation is an agency of the Department of the Interior and was established in 1902 to oversee the development and conservation of the Nation's water resources...

The Cougar Project?Turbine Runner Replacement
The Cougar turbine runners have been subjected to a substantial amount of cavitation damage which has required repair by welding. The continued welding repair has subsequently resulted...

Independent Turbine Testing and Research
The St. Anthony Falls Hydraulic Laboratory (SAFHL) is presently upgrading their Turbine Test Facility. Completion of the upgrade, including checkout tests, is scheduled for Fall 1987....

Hydro Machinery Problem Solving Experiences
Within the last decade the use of modern data acquisition instrumentation and techniques have moved the subject of the machinery problem solving into a more scientific arena. This paper...

Programmable mMicroprocessors in Local Control of Hydro Power Plants
The main purpose of the control equipment is to provide the generator with means for operation of the power station equipment. There is a need for status information on the generating...

Efficiency in Auxiliary Electrical Systems
In 1984, during the preliminary design for the proposed second powerhouse at the Corps of Engineers' McNary Dam on the Columbia River, the more recent improvements and techniques...

The Design and Operating Experience of a Multiplexer Application in Conventional Hydro Powerhouse Control
The design of the Bonneville Second Powerhouse control system presented an opportunity to replace conventional cables with a multiplexer system that would provide a two-way data communication...

Voltage Versus Var/Power Factor Regulation on Hydro Generators
When paralleled to the utility bus, synchronous generators can be controlled using either terminal voltage or var/power factor regulation. Selection is dependent upon the size of the generator...

Large Low-Speed Generators with Skewed Supporting Parts
During the past decade, the demand for hydro-generators has been for increasingly high ratings, up to the present maximum of about 800 MVA. These low-speed machines have rotor diameters...

Electrical Equipment for Pumped Storage Plants
Selection of generator/motors and other electrical equipment for pumped storage plants requires consideration significantly different than for conventional hydro plants. This is particularly...

Influence of Surface Finish on Thrust Bearing Life
The original pivoted pad thrust bearing installed and fitted at the Holtwood Power Station in 1912 by A. Kingsbury has been operating continuously since that time without any difficulty....

What is Wrong with our Hydro Generators?
A number of studies have already been presented on the refurbishment and modernization of hydro facilities and also the design and upgrading of the generators. This paper will partly deal...

McNary Powerhouse Generating Unit 14 Stator Core and Winding Replacement
The powerhouse contains 14 main generating Kaplan-blade units, each rated at 73,684 kVA at 0. 95 power factor. In early 1985 the decision to rewind and uprate Unit 14 was being finalized....

Accelerated Life Testing of Generator Coils
This paper presents a step-by-step procedure for doing a 400 hour, 60 Hz, 90 degree C accelerated life test on generator coils. Test procedure is as follows: 1. Initial coil examination...

Fretting Corrosion on Large Split Thrust Bearing Runners
In the early fifties interfacial slip was measured on laboratory models. Design improvements, resulting from these tests, were incorporated into later machines. These improvements appreciably...

Hydropower in the Kodiak National Wildlife Refuge
The Terror Lake Hydroelectric Project is unique in that it is the only energy project to be constructed in a National Wildlife refuge. A National Wildlife Refuge has few equals to blocking...

Small Hydrodevelopment: An Owners Perspective?El Vado, New Mexico Hydroelectric Project
The construction of the El Vado Hydroelectric Project posed several unique problems. The joint ownership of the dam between a Federal and State agency was unique to the region. The proposal...

Pyrites Hydroelectric Project, Canton, New York
This paper describes the Pyrites Hydroelectric Project in Canton, New York, an 8-MW project completed in December 1985. The key to its successful development was a team approach that included...

 

 

 

 

Return to search