Prediction of Highway Construction Noise Levels
A model for the prediction of noise levels from highway construction operations has been developed under sponsorship of the Federal Highway Administration (FHWA). Noise sources are geometrically...

Highway Noise: FHWA Requirements and Barrier Design
Since 1973, the Federal Highway Administration (FHWA) has required noise studies for nearly all proposed roadways and roadway improvements that receive federal aid. An overview of these...

Summary of the Accomplishments of the Federal Rail Transit Vibration and Noise Control Technology Program
The U. S. Department of Transportation's Urban Mass Transportation Administration and Transportation Systems Center have played an active role in assisting the U. S. rail...

Cost-Effective Design of Practically Vibration-Free High-Technology Facilities
Advanced electro-optical equipment, such as that used in the production of integrated circuits, requires clean environments with extremely limited vibrations. Ground motions, personnel...

Site Selection and Building Design for Minimizing Vibration
Over the last five to ten years, line resolutions required for state-of-the-art semi-conductor wafers have dropped to well below 1 micron. As a result, controlling environmental building...

Soil Nailing Supports Excavation
Excavation for the PPG Headquarters complex in Pittsburgh, Pa. was critical because the site is adjacent to three historically important buildings. Soil nailing, a method of in situ earth...

Municipal Refuse: Is Burning Best?
Communities are increasingly worried about polluting groundwater, and it is increasingly difficult to get permits to start new landfills. For these reasons, there is a trend back to municipal...

Behavior and Strength of Stub-Girder Floor Systems
The paper presents a detailed evaluation of the behavior and strength characteristics of the stub-girder floor system. This is a composite girder and beam structure that integrates the...

Building on Muck
The Craney Island Disposal Area at Norfolk, Va. is a 2,500 acre depository for material dredged from ports and channels in the Hampton Roads. The U.S. Army Corps of Engineers extended...

Quality in the Constructed Project
The purpose of the workshop summarized in this book was to develop an agenda for ASCE actions to promote quality in the constructed project. The papers, discussions and session reports...

Rebuilding America
Infrastructure Rehabilitation
The future of the nation demands a solution to the problem of our deteriorating infrastructure. Civil engineers are called on to act as guardians of our public works facilities that must...

Groundwater Models: Converting Research Developments into Practical Applications
One method of bridging the gap between code developer and code applier is through separate user-friendly computer programs called preprocessors that prepare data before execution of the...

The National Ground Water Information Center Data Base
The Research Institute, Education Foundation and Publishing Company of the National Water Well Association have long been considered information central for the world's community of hydrogeologists....

Data Transforms on USGS Surface Water Records
Surface water records compiled and stored by the United States Geological Survey (USGS) on machine readable tape are transformed and analyzed by computer methods to enable visual inspection...

User-Friendly Reservoir Routing on Minicomputers
Two models for routing reservoir releases and computing reservoir elevations for the TVA reservoir system are described. The models are designed for use on a 16-bit minicomputer with a...

Integrated Design Methodology for Urban Stormwater Detention Facilities
The objective of this paper is to present the core of a design methodology that avoids the pitfalls of the design storm concept by using a microcomputer algorithm to estimate the long-term...

Forecasting Demand for Urban Water
The purpose of this study is to assess current water use forecasting practice in the US Army Corps of Engineers and to recommend additional approaches which best satisfy current requirements....

Solving a State Environmental Agency Computer Maze
This discussion relates the experiences of a state environmental agency in addressing a decade of inadequate attention to the importance of computers and automated data processing to the...

The ADP Problems of a River Basin Commission
The Susquehanna River Basin Commission is an independent governmental agency that recently acquired its first in-house minicomputer system. The staff usage of this system has created two...

Methodology of Determining Acceptable Levels of Heavy Metal Contamination in Municipal Sewage Sludge Applied to Cropland
The potential public health risks associated with the agricultural utilization of municipal sewage sludge dictate the development of environmentally acceptable criteria for the disposal...

 

 

 

 

Return to search