Construction Management at Sikes Superfund Site
Lockwood, Andrews & Newnam, Inc. (LAN) is providing Construction Management services on the Sikes Superfund site. The project involves constructing an incinerator on-site and incinerating...

Who is Taking Out the Garbage?
Due to the shortage of landfill space and the increasing amount of waste being generated, current waste disposal techniques should be studied and revised. New methods should be implemented...

Noise Control Program for the Boston Harbor Project
A noise control engineering program has been instituted for the Boston Harbor project to make the facility virtually inaudible at the property line. The program integrates the noise mitigation...

Information Entropy and Environmental Engineering
Environmental engineering decisions are often made with limited information. In such cases it is useful to express uncertain quantities with a probability distribution. The use of information...

A New Graphic Technique for Reporting Soil Quality Analyses
Boston's Artery/Harbor Tunnel Project is currently the United States' largest highway construction project. One of its major issues is the disposal of an estimated...

Electronic Computation
This proceedings, Electronic Computation, consists of 46 manuscripts presented at the Tenth Conference on Electronic Computation held parallel...

High Level Radioactive Waste Management 1991
The proceedings of the second annual international conference on High Level Radioactive Waste Management, held on April 28 - May 3, 1991, Las Vegas, Nevada, provides information on the...

Connecting With DOTs
Want to bid on projects from state departments of transportation? First make sure your firm can translate computer-assisted drafting (CAD) drawings into different computer file formats....

Unit Pricing and Unbalanced Bids
Unit price contracts were meant to provide a simple and equitable way to pay contractors. However, to offset the uncertainties inherent in construction, contractors unbalance bid items....

Setting Standards in San Diego
Most engineering firms have developed specifications and standards that become the bible for project-related design issues�and no two firms are the same. On complex, large-scale projects...

Breaking Down the Barriers
The structural engineering of multistory buildings is a complex and time-consuming chore, but new design and analysis tools can greatly simplify the task. The article traces the development...

Pumped Storage Promise
With many utilities facing potential shortfalls in generating capacity, pumped storage hydro plants could be a key to meeting peak-period energy demand in the 1990s. Pumped storage plants...

Monte Carlo Simulation Techniques for Predicting Annual Power Production
The problem of the creation of a simulation model utilizing the Monte Carlo method at a single site is addressed. The result of the analysis is a picture of the production at the site...

Evaluating Hydro Relicensing Alternatives?Impacts on Power and Non-Power Values
The relicensing of 300 hydroelectric plants in the next decade involves a total capacity of about 4,000 MW - a $10 billion value. A methodology recently developed by Decision Focus Incorporated...

Techniques for Balancing Instream Flow Needs with Project Operation
Balancing power and non-power benefits of hydroelectric developments has become a controversial issue in the relicensing of projects. Multiple project and multiple objective flow management...

Using Project Management Techniques in Hydro-Relicensing
To answer a pressing need for managing today's complex process and requirements of hydro relicensing, Central Maine Power Company (CMP) has applied the principles of project management,...

When FERC Investigates Your Unlicensed Project: A Five-Point Protection Plan
A FERC investigation into a project's jurisdictional status poses the potential for substantial risks and costs. This paper outlines a 'five-point protection...

Document Image Systems for Hydro License Compliance
This paper will present one company's experience in selecting and implementing a document imaging system for management of correspondence, environmental studies, dam safety...

Dealing with the Difficult Utility
The experience of an independent hydroelectric power developer, STS HydroPower, Ltd. (STS), involved in the full scope of hydroelectric activities is desribed. The purpose of the paper...

Small and Low Head Pumped Storage Projects
With the recent completion of several very large pumped storage projects, the perception of a hydroelectric pumped storage project in some power industry circles may be that of a project...

 

 

 

 