Incipient Resuspension of Silt-Clay Sediment
The laboratory study of incipient motion of fine-grained cohesive sediment under oscillatory flow, unidirectional flow and the combined effects of oscillatory and unidirectional flow is...
Scour and Fill Monitoring at Lock and Dam No. 26 (Replacement), Mississippi River
Information gathered during construction of the first stage dam is presented. The information consists of data indicating flows and stages along with data obtained from surveys which monitor...
Numerical Simulation of the Bed Armoring Process
The stability of a river channel depends to a great extent on sediment characteristics. If the amount of sediment coming into a given reach for some reason becomes less than the river's...
Water and Sediment Movement in Irrigation Furrows
Water movement in an irrigation furrow is simulated by numerically solving the governing equations of continuity and momentum for unsteady, spacially varied flow in a pervious bed open...
Modeling of a Multifunctional Hydraulic Structure
A 1:12 scale Froude model of a hydraulic control structure in the Rochester Combined Sewer Overflow Abatement Program (RCSOAP) was constructed and tested to optimize the design requirements...
LTER and Management of the Upper Mississippi River
The Upper Mississippi River is managed for multiple use by two federal agencies and five states. System management objectives include commercial navigation, commercial fisheries, minimum...
Nebraska's Shrinking Platte River Channel: Hydrologic Aspects and Implications
Biologists have proposed two hypotheses to explain recent channel narrowing and vegetative growth in flood plain habitat areas along the Platte River in Nebraska. One group contends, without...
Alternative Layouts for Hydro Headrace Tunnels
The recent development of tunnel boring machines capable of excavating hard rock at virtually any grade together with the Norwegian experience in compressed air surge tanks provides the...
Research in Hydraulics at California Institute of Technology
Activities are centered in the W. M. Keck Laboratory of Hydraulics and Water Resources. Research projects active at the Laboratory reflect a continuing commitment to traditional areas...
Lifeline Earthquake Engineering
Performance, Design and Construction
Lifeline Earthquake Engineering: Performance, Design and Construction is a follow-up publication to the Technical Council on Lifeline Earthquake Engineering publication Advisory Notes...
Light Rail Gains New Momentum
Light rail, which evolved from the old trolley lines, is staging a comeback in U.S. cities. Light rail is a fixed guideway, operator controlled system, offering an alternative to heavy...
Building on Air
Copley Place, a $500 million hotel/retail/office/residential complex, was built on air rights over the Massachusetts Turnpike and an adjacent railroad in Boston. Two hotels occupy land...
Highway Capacity Manual Revisited
The forthcoming third edition of this manual of highway and traffic engineering, due in 1985, will significantly change how highway capacity is analyzed. Of the edition's...
Asphalt: Great Expectations
A $50 million, five year research program has been proposed for research into asphalt as part of the larger ($150 million) Strategic Transportation Research Study (STRS). The research...
Dredging and Dredged Material Disposal
Waterborne commerce is a major factor in the economy of many countries. Because waterborne commerce depends on the ability of nations to provide adequate navigation channels to transport...
Calendar: A 1985 Calendar of Bridge Photographs
Featured bridges are: Golden Gate Bridge (CA); Richmond . San Rafael Bridge (CA); Market Street Bridge (PA); Alsea Bay Bridge (OR); Longview Bridge (WA); Tyrone Bridge (KY); Newport Bridge...
Infrastructure Crisis: What the Media Are Saying
In the past year and a half the national media have performed the major role in spreading the word that the nation's public works, particularly in urban areas, have been neglected...
Measurement of Hydrographic Parameters in Large Sand-Bed Streams from Boats
This report concentrates on the state-of-the-art in the field documentation of the existing channel geometry, plus the concurrent stream flow and sediment transport characteristics, prevailing...
Computers: The Ins and Outs of the Purchasing Contract
When purchasing computers and computer graphic systems there are 13 areas in the purchasing contract that should be investigated. These include the agreement, specification, dates, inspection,...
Arizona's Statewide Pavement Management System
A pavement management system developed for Arizon's 7400-mile network of highways has resulted in a savings of $14 million in its first year and a forecast savings of $101...
Return to search