AIRTRANS System Maintenance
This paper addresses AIRTRANS, and in particular, its maintenance organization, facilities, tasks and methodologies. Recognizing that other automated people movers (APM's)...

A Methodology for Forecasting APM Operation and Maintenance Trends Using Existing Experience
Operation and Maintenance responsibility for the Morgantown, West Virginia Automated People Mover (APM) was assumed by West Virginia University some nine years ago. The experience of the...

Behavior of Cavity Masonry Walls Under Out-of-Plane Lateral Loading: An Analytical Approach
In this paper, a finite element model is used to analyze cavity walls in an attempt to understand their complex behavior and to evaluate the adequacy of the assumptions embodied in the...

The WMATA Resident Engineer?The Team He Leads and His Responsibilities
This paper discusses the role of the Resident Engineer as a key member of any construction team. It uses the organization and functions as practiced at the Washington Metropolitan Area...

The Resident Engineer?A Member of the Construction Team
The paper discusses the prime concern of a resident engineer, namely, seeing to it that the structure built is in accordance with the plans and specifications and that the work is carried...

The Resident Engineer as Construction Team Member
The success of a construction project is affected by the actions of the resident engineer (RE). Good REs don't come off the street; they are developed through training and...

The Role of the V.A. Resident Engineer
The Resident Engineer plays a vital part on the Veterans Administration construction team. He serves as a hub for communications between the various members of the team as well as the...

The Resident Engineer?Staffing the Team
One of the initial actions a Resident Engineer (RE) must grapple with each time he begins a new construction project is how to staff his construction team. The balancing of the type and...

Construction Scheduling for Public Sector Projects
The paper presents some types of scheduling systems that are utilized in Postal Service projects as well as the advantages and disadvantages of each. It is suggested that schedule approval...

Insulative Lightweight Concrete for Building Walls
Research is currently being conducted to develop a portland cement concrete for use in low-rise building walls that will combine the structural, thermal insulating, and heat storage capacity...

Nine Years' Service with Deep Polymer Impregnation
A test installation of deep polymer impregnation was applied to a heavily traveled bridge deck in Bethlehem, Pennsylvania, in 1975. The deep polymer impregnation process involved drying...

Specification Deficiencies?Contract Disputes
The costs of rework, replacement, duplication, delays, and related administration are major factors in disputes. The major reasons for specification-caused disputes are discussed. A three...

Better Design Documents Through Constructibility Review
The Corps of Engineers (Corps) improves the quality of design documents by an extensive program to review in-house and Architect/Engineer (A/E) designs. This review is composed of several...

The Printed Word: A Defense Against Liability?
Design professionals should endeavor not to write burdensome or inaccurate contracts; i. e. , those that inaccurately describe duties. Inspector liability is not relieved by ambiguity...

Inspection Costs Versus the Benefits Derived
The following text describes the experiences of a small suburban municipality located in Middle Tennessee before, during and after a five-year program of comprehensive inspection and testing...

An Owner's Role in Dispute Avoidance & Resolution
Construction disputes can be avoided in number and severity through education of the project team. This paper will identify a variety of ways an owner can avoid disputes, pinpointing reasons....

Building Condition Assessment�An Owner's Perspective
The Port Authority of New York and New Jersey has recently instituted a program to inspect all of its buildings structures to insure structural integrity and public safety and to provide...

Revitalization of Existing Buildings: An Owner's Perspective
Revitalization of the large stock of existing buildings in this country is of paramount importance today to building owners, who want the value of existing properties to appreciate as...

Evaluation and Modernization of Veterans Administration Facilitaties
This paper discusses two examples showing in detail that procedures for building assessment require much consideration for engineers' programming and must be properly specified...

Changing Priorities in UK Construction Research
This paper addresses two types of situations to contend with in building assessment: aging structures all built at about the same time and to standards no longer acceptable, and newer...

 

 

 

 