TBM Tunnel Friction Values for the Kerckhoff 2 Project
In the mid-1970's Pacific Gas and Electric Company began design of the Kerckhoff 2 Hydroelectric Project, which supplements the Kerckhoff 1 project built in 1919. The Kerckhoff...
Hydropower in the Kodiak National Wildlife Refuge
The Terror Lake Hydroelectric Project is unique in that it is the only energy project to be constructed in a National Wildlife refuge. A National Wildlife Refuge has few equals to blocking...
Small Hydrodevelopment: An Owners Perspective?El Vado, New Mexico Hydroelectric Project
The construction of the El Vado Hydroelectric Project posed several unique problems. The joint ownership of the dam between a Federal and State agency was unique to the region. The proposal...
Pyrites Hydroelectric Project, Canton, New York
This paper describes the Pyrites Hydroelectric Project in Canton, New York, an 8-MW project completed in December 1985. The key to its successful development was a team approach that included...
After L'Ambiance Plaza
In the aftermath of the tragic collapse of the L'Ambiance Plaza apartment building at Bridgeport, Conn., in April 1987, reforms are being proposed. In 1987 ASCE approved writing...
Grout Supports Brooklyn Tunneling
At the Red Hook project in Brooklyn, microfine cement grout was injected from the surface to support underground tunneling. The hand-dug tunnel was built to connect to sewer pipes. Subsurface...
Landmarks in Civil Engineering
Historic American engineering projects sampled in this article represent those documented in
Sewage Plant Engineered for Value
The Camden County (NJ) Municipal Utilities Authority was formed in 1972 to cope with suburban growth that had overloaded 34 primary treatment plants. By the early 1990s, the Authority...
A Station With a View
The Port Authority TransHudson Corp. (PATH) is renovating and expanding Exchange Place station, the first stop in New Jersey across the Hudson River from lower Manhattan. To be completed...
Building Bridges Faster
Guidelines are presented that tell how to write a contract that will lead to radical reductions in the time to build or rebuild a bridge. The article covers how to write an incentive/disincentive...
A Combined RCC and Reinforced Concrete Spillway
Stacy Dam features the latest evolution in the use of roller compacted concrete for construction of spillways. Because of unusual site conditions, RCC will be used in three different parts...
Behavior of Completed RCC Dams
Enough roller compacted concrete dams have been completed to allow an overall evaluation of this new approach to construction. Performance has been good. No operational restrictions have...
Bond Strength of Roller Compacted Concrete
Roller compacted concrete, or RCC, is a dam construction method which consists of placing horizontal layers of no-slump concrete in 1- to 3-ft (0. 3- to 0. 9-m) lifts and compacting the...
Design and Construction of Lower Chase Creek Dam
Lower Chase Creek Dam is a roller compacted concrete flood control dam located in a generally dry creek in eastern Arizona. Dam design, including the site investigation and start-up of...
Construction of Elk Creek Dam
Construction of Elk Creek Dam, located in Southwest Oregon, is currently underway with completion scheduled for September 1988. The main dam contract was awarded to Ohbayashi Gumi Ltd....
Construction of Upper Stillwater Dam
This paper describes the equipment, placing methods, and peak production rates from the contractor's viewpoint for both the Roller Compacted Concrete and the Slipformed Facing...
Quality Control/Inspection�Upper Stillwater Dam
Roller compacted concrete construction, or RCC, is a relatively new method of constructing concrete dams and involves placing and spreading no-slump concrete in horizontal layers and compacting...
Whither Roller Compacted Concrete for Dam Construction?
During the formative years of the roller compacted concrete (RCC) dam, three different approaches to the design have evolved; the lean RCC dam, the RCD (rolled-concrete dam) method and...
Quality of Works in RCC in France: A Contractor's Solution
Bec Freres S. A. , a French dam contractor, introduced the technique of roller compacted concrete (RCC) into France. The first two French RCC dams were built as a result of a program of...
RCC in Dams in Australia
The design, construction and performance of the first three dams constructed in Australia, using RCC are described. Aspects covered in the paper include designing for zero cohesion between...
Return to search