APM System Performance and Guideway Design Parameters
Automated People Movers (APM) are a relatively new form of transportation system becoming popular over the last twenty to twenty-five years. They are characterized by fully automatic and...

Investigation of Design Criteria for APM Guideways
Designers have relied mostly on the provisions of the American Association of State Highway and Transportation Officials (AASHTO) Standard Specifications for Highway Bridges. Sometimes...

Standardization of AGT Systems in Japan
Automated guideway transit systems (AGT) have been developped by different private firms in Japan, and therefore, the system components and dimensions are somewhat diversified. Such diversity...

Lille DPM System & VAL Family
This document provides a brief description of the different steps from the beginning to the total completion of the Lille downtown people mover (DPM) program in France. The system performance...

Development and First In-Service Use of Automatic People Movers in the Federal Republic of Germany, with Special Reference to the Magnetic Levitation System M-Bahn
People movers have been under development for the past 14 years in the Federal Republic of Germany. Of the four systems developed, two have been put into service. One of the two successful...

Emerging Technology?A Solution to Airport Access Problems
This paper reviews airports which presently have employed people movers, the problems they are solving, and potential use for solving access problems and create added value for the investment...

Brazil's Innovation in APM Technology
The paper discusses an automated people mover (APM) called an Aeromovel which consists of pneumatically-controlled vehicles weighing less than 20,000 pounds with a capacity of 300 passengers....

Unique Features of Automated People Mover Systems
This paper identifies the characteristics and unique features of the automated transit system presently being installed in the central business district of Detroit, Michigan. This system...

Detroit's DPM Maintenance and Control Facility
The Maintenance and Control Facility (MCF), a single building complex for the Detroit Downtown People Mover (DPM) system, incorporates the people mover system's transit vehicle...

A New Alternative in Steel Construction?Partially Restrained Connections
Lack of formal training in methods as well as the lack of specific guidelines have limited the understanding and utilization of semi-rigid connection technology. A renewed interest in...

The Effect of Connection Flexibility on Steel Members and Frame Stability
With the advent of Load and Resistance Factor Design (LRFD) and the many existing moment-rotation curves for connections, the use of actual connection flexibility in the design process...

Buckling of Flexibly-Joined Simple Frames
A nonlinear analysis of plane elastic frames is presented. The static loading consists of both eccentric concentrated loads (near the joints) and uniformly distributed loads on all or...

An In-Plane Finite Element Model for Brick Masonry
A finite element model for brick masonry is reported. The model takes account of non linear deformations and progressive local failure. The failure may occur in the joints alone or in...

Behavior of Cavity Masonry Walls Under Out-of-Plane Lateral Loading: An Analytical Approach
In this paper, a finite element model is used to analyze cavity walls in an attempt to understand their complex behavior and to evaluate the adequacy of the assumptions embodied in the...

Shear Design of Masonry Walls
The paper presents a summary of a research project carried out at the Swiss Federal Institute of Technology Zurich to develop a design method based on the ultimate strength of masonry...

Load-Bearing Capacity of Masonry Walls in a Critical Buckling Condition Taking Into Account the Restraining Effect of Floor Slabs
This paper studies the buckling effect of masonry walls and concrete floor slabs as a frame system. The frame is calculated according to the theory of II. order. The buckling length, the...

Wall/Floor-Slab Interaction in Brickwork Structures
The paper summarises the results of three series of tests on sections of brickwork structure carried out with a view to determining the characteristics of wall/floor slab joints in terms...

Learning from Failures: Procedural Changes in the Design and Construction Process to Reduce Failures
This paper first defines failures and their number and scope in the design and construction fields. It then presents the writer's opinion as to the cause of the failures and...

Analysis of Cracking of I79 Bridge at Neville Island
A large crack was discovered to form in a girder of the I-79 Glenfield Bridge over the back channel of the Ohio River near Pittsburgh on January 28, 1977. A section of the girder containing...

General Continuum Models for Discrete Structures
New knowledge is presented about the structural behavior of a variety of large repetitive lattice configurations of the type appropriate for utilization in cosmic space. Focus is placed...

 

 

 

 

Return to search