Cleaning the Nut Island Outfalls
As an early component of a comprehensive program to reduce pollution in Boston Harbor, two 80-year-old cast-iron outfalls, each 60 inches in diameter and a mile long were cleaned in a...

Boston's Future Water Supply
The Massachusetts Water Resources Authority is responsible for planning and providing water to metropolitan Boston. Recent state legislation directs that conservation, development of local...

World Energy Outlook
In response to lower energy prices and reinvigorated economic growth, demand for all forms of energy is increasing steadily. With the growing realization that man's resources,...

Ground Freezing for Construction
For almost a century, freezing has been used successfully as an art to stabilize ground and control groundwater. First employed by the mining industry in Europe, it has since been widely...

Revitalization of Urban Water Supply and Distribution Systems: Detroit and Phoenix Case Studies
In 1980 the people in the Detroit Water and Sewerage Department were asking themselves the kind of question that is facing the managers of many municipal utilities in this country these...

Infrastructure Awareness: Successful Techniques
The need to rehabilitate and upgrade our infrastructure systems, specifically the systems of water supply and distribution, wastewater collection and treatment, bridges, highways and mass...

The National Infrastructure Act
Today, more than ever before, the United States faces a serious problem related to the condition and adequacy of its basic infrastructure - surface transportation, water supply and distribution,...

Design and Model Testing of an Arctic Seawater Intake for Sedimentation and Wave Effects
A seawater intake structure is being designed to provide flood water for tertiary recovery of oil from the Kuparuk oil field near Prudhoe Bay, Alaska. A wave effects study establishes...

Methods for Reliability Analysis of Water Distribution Networks
A detailed review of the literature reveals that there is currently no universally accepted definition or measure of reliability for water distribution networks. The purpose of this paper...

Initial Operation Model for the Central Arizona Project
A microcomputer program for operating uncompleted portions of the Central Arizona Project has been developed. Engineers may use this program daily to assist in scheduling pumping plant...

Coping with Transition: Improving the Management Process
At Arkansas Power & Light Company, the Energy Supply Department has some 2,000 employees and operates (in addition to providing General Office engineering, technical, and administrative...

Crown Corporation Approach to Watershed Management
On July 1, 1984, the Government of Saskatchewan proclaimed the Water Corporation Act. The Act formed the legislative basis for the newly formed Saskatchewan Water Corporation and ushered...

Chaparral Watershed Management: A Systems Approach
The predicted environmental and economic effects of partial chaparral conversion for increased water yield on an experimental watershed in the Prescott National Forest, Arizona, are examined...

Mass. Municipal Watershed Management?Case Study
Most of the estimated 200,000 acres of municipally-owned watershed land in Massachusetts currently suffers from a lack of wise, multiple-use forest management which has resulted in lost...

Landslide Hazard Rating for the Oregon Coast Range
The landslide hazard rating system for shallow soils on steep terrain over hard sandstone has three components: ground water response to precipitation, soil shear strength (including root...

Predicting Forest Snow Water Equivalent
In California, the snowpack of the Sierra Nevada provides more than one-third of the state's water needs. Regression models used to forecast this supply do not include measurement...

A Giardia Source Investigation in a National Forest Municipal Supply Watershed
For nearly 100 years, the City of Missoula, Montana, obtained most of its municipal water from a surface water supply, Rattlesnake Creek. The Rattlesnake watershed lies within the Lolo...

A Case History of Leakage from a Surface Impoundment
A manufacturing company constructed a 48-acre (19 hectare), unlined surface impoundment at a site in northern Texas to store wastewater. The site is underlain by unsaturated, alluvial...

Assessing Seepage at Uncontrolled Hazardous Waste Sites
This paper presents a conceptual framework for estimating the concentration of organic contaminants in a groundwater plume over time. The basis of this framework is the application of...

Municipal Refuse: Is Burning Best?
Communities are increasingly worried about polluting groundwater, and it is increasingly difficult to get permits to start new landfills. For these reasons, there is a trend back to municipal...

 

 

 

 

Return to search