Alternative Methods for Payment of Construction Equipment Ownership Costs on Federally Funded Projects
Construction equipment investment is a significant portion of the capital investment for contractors specializing in heavy construction. Operating this equipment under the changes clause...

Financial Statement Impact of the Rent/Lease/Buy Decision for Contractors using Heavy Equipment
Contractors with substantial equipment requirements must carefully weigh all of the quantitative and qualitative factors related to how they finance their equipment. Certain of these factors...

Lessons Learned from Design, Construction, and Performance of Hydraulic Structures
The intent of this publication is to provide lessons learned, both positive and negative, from activities associated with design, construction, and performance of hydraulic structures....

Keeping Sand at a Standstill
Construction of roads, railroads, pipelines and other facilities removes the native vegetation from sand dunes. As a result, sand movement starts and entire dunes may become active. This...

An Integrated Approach to Structure and Control Design of Space Structures
In this paper the authors have investigated the effect of passive damping on the optimum structural design with active controls. The minimum weight design is obtained by imposing the constraints...

A System Framework for Engineering Risk Analysis
A mathematical system framework is developed to model a series of criteria called performance indices (PI) related to engineering risk in water resources. Such criteria include reliability,...

Impacts of Risk-Based Analysis on Current Design Practices
A summary of hydrologic design standards used by selected federal agencies for the safety evaluation of dams is presented. A computational procedure is outlined to develop hydrologic design...

The Forms and Variations of the CM System
The CM system has slowly acquired identity and definition since its spontaneous and controversial start nearly two decades ago. The numerous proprietary forms and variations of the system,...

The History of Construction Management
Construction Management's origins can be traced to several forerunners, and its development, although short, has seen many changes of both practice and attitude. Its cost...

Educational Programs Supporting the CM System
The speed with which the CM system has entered the daily practices of the industry has caught educators in a lag. The management of construction and construction management were considered...

A CM Multiple Contracting Cost Model
The original purpose for construction management was cost savings through time savings and efficient operations. As the CM system expanded in use and scope of services other very significant...

A Review of Current Contract Documents
Three separate industry groups have published contract documents to be used with the construction management project delivery system. The documents parallel each other in certain respects,...

A CM's Exposure to Liability
Before identifying potential liability, it is first necessary to define the construction manager's (CM) status and duties. These are delineated in the contract requirements...

Hydraulic Transient Analysis on a Micro Computer
The shift toward micros has reduced prices and increased accessibility, permitting engineers to bypass 'bureaucratic' DP departments and run programs as often...

Quality Assurance in a Large Firm
This paper will describe the formalization of the Quality Assurance Program in a large consulting engineering firm. Although Quality Assurance and Quality Control have been a part of normal...

Avoiding Failures Caused by Lack of Management
Engineering failure often results from administrative or managerial failure. In addition to providing sound engineering or technical services, we have a responsibility to administer and...

The Charles River Project
The Charles River Project received the 1984 Presidential Award for Design Excellence in Architecture, Engineering, and Urban Planning. Sited between Charlestown and Boston's...

Design and Effectiveness of Urban Retention Basins
Retention basins are recommended by practicing engineers and regulatory agencies for stormwater management in new land developments. They may require considerable space which limits their...

Bridging the Joints in Bridges
Most bridges are designed with gaps in them. The cracks allow bridges to expand and contract as the temperature changes. But water can enter these gaps and foul bearings and structural...

Designing for Flow
Geotextiles used for in-plane drainage can carry surprisingly large amounts of water within their structures. These composite drains, known as sheet drains, prefabricated drainage composites...

 

 

 

 

Return to search