Undrained Cyclic Behaviour of Beaufort Sea Silt
Cyclic loading behaviour of Beaufort Sea silt has been studied under triaxial conditions, with and without static shear stress, to define the resistance to liquefaction or cyclic straining...

Wave Induced Liquefaction and Scouring in Yukon Prodelta Silts
The scouring potential of the Yukon prodelta has been investigated. The results obtained from geologic, hydrodynamic and geotechnical considerations indicate that probable liquefaction...

Cyclic Multiaxial Cubical Cell Experiments on a Norton Sound Silt
A servo-controlled multiaxial cubical test apparatus has recently been used to investigate the behavior of the foundation soil for a gravity structure in Norton Sound of the Alaska Outer...

Ice Load Prediction with the Use of a Rate-Dependent Anisotropic Constitutive Law
Man-made structures built in arctic offshore areas are subject to ice loads. Traditional methods for estimating ice loads rely on an indentation factor from rigid-plasticity, an empirical...

Single Point Moorings for the Bering Sea
Multi or single-legged buoy systems such as conventional CALMs or SALMs would not survive the winter season in the Bering Sea because the forces generated in the anchoring chains by pack-ice...

Deep-Water Platform Solutions for the Navarin Basin
The environmental conditions prevailing in the Navarin Basin may impose limitations on the type and shape of production, storage and loading structures. The magnitude of the wind and wave...

Foundation Response of Arctic Structures to Time-Dependent Ice Loadings
Arctic structures are subjected to a variety of time-dependent loadings, the most important of which are those due to ice. An approach is presented for estimating the strength and deformation...

Creep Rate Analysis of Pile Load Test Data
The uniform creep behavior of five driven piles and one slurried pile based on pile load test data are presented and analyzed. The incremental static load tests carried out by ARCO, Alaska...

Developing a Drilling Structure for Arctic Waters
Fluor-Doris of Houston has developed a mobile, composite concrete and steel drilling structure called the Arctic Composite Platform (ARCOP). This platform is capable of operations in water...

Arctic Drilling and Production Platform Concept
An 80-well Arctic drilling and production platform for water depths to 100 feet in the Beaufort Sea transition ice zone is presented. It includes a novel inner caisson to help resist large...

Research Challenges in Frozen Ground Pile Design
A fairly recent pile design analysis is reviewed. The influence of such factors as temperature, salinity, loading, etc. on frozen ground pile design is pointed out. Since many facets of...

Earth Pressure on Underground Concrete Pipe in a Field Test
The cause of cracking at the sheetpile extraction in concrete pipes buried by the open excavation method was investigated by loading tests on the pipe and a field test carried out by Osaka...

Multi-Truss Design for Tower
A modified structural steel system of outrigger trusses and belt trusses bolster the 54-story Equitable Tower West. Located in New York City, the building's structural system...

Management Secrets of Top Consultants
Leaders of five consulting civil engineering firms, which are considered among the best managed, discuss management strategies. In all cases, carefully selected personnel is considered...

Skyscraper (review)
The 1984 novel Skyscraper, by civil engineer-writer Robert Byrne, tells the suspenseful story of the collapse of a new, 66 story skyscraper...

Coordination and Control - Staff, Consultants and Participating Agencies for Sacramento Light Rail Transit Project
The Sacramento Light Rail Transit Project is an 18. 3 mile (29. 5 Km) line, primarily at-grade, which provides the trunk line service for an integrated Bus/LRT public transportation system...

Scheduling and Cost Control for the Pittsburgh LRT
Like most American cities, Pittsburgh has had a long history of public transportation utilizing street cars. Conversion to a modern light rail transit (LRT) system will occur in two stages,...

Cable Car Renovation Project: On Time and on Budget
San Francisco Municipal Railway officials had originally expected it would take three years to renovate the nine miles of deteriorated trackway and restore and seismically upgrade the...

Finite Element Methods in Structural Safety Studies
The use of finite element methods in structural safety studies is discussed and recent work in the area is briefly reviewed. Formulation for a first-order stochastic finite element method...

Concepts and Methods in Reliability-Based Structural Optimization
This paper presents an overview of the major concepts and methods used in reliability-based structural optimization. New formulations related to multicriteria optimization are developed....

 

 

 

 