Diffuser Performance for Draft Tube Applications
Available information on diffuser performance is summarized in relation to draft tube applications. This paper is particularly directed at the implications of basic research with these...
Leakage from Pressure Tunnels and Shafts
Several issues related to leakage from unlined pressure tunnels and shafts are reviewed and discussed. They include confinement, or cover requirements relative to hydraulic jacking of...
Analysis and Testing of Transient Pressures at Camp Far West Hydroelectric Project
The objective of this paper is to present a comparative discussion of the results of theoretical analysis of transient pressures and of field tests performed on the Camp Far West Hydroelectric...
Hydraulic Machines Model Acceptance Tests
The article begins with a description of the modern test installations, giving the dimensions of the models most frequently used and the head heights. Attention is then given to the most...
Conventional Machinery/Unconventional Applications
The U. S. Bureau of Reclamation has become increasingly involved in small-scale hydroelectric projects involving unconventional applications for conventional hydraulic machinery. One ongoing...
An Overview of Hoover Dam Tunnel Spillway Damage
The Hoover Dam tunnel spillways have provided the Bureau of Reclamation hydraulic laboratories with new and continued opportunities for applied research. During the peak years of the Boulder...
Modernization of Existing Hydroelectric Power Stations in Conjunction with Conversion to Automatic Operation
The easiest and, in the long run, the least expensive method in most cases is the installation of an electronic turbine governor that is not only easy to incorporate in the power station...
Experiences During Overhaul of Hydroelectric Units
This paper describes some of the conditions found during major overhaul of main units at two hydroelectric power plants. Problems encountered and their solutions are described. The effects...
More Kilowatts with Less Investment
The paper discusses partial or complete modernization of hydraulic units and/or governing system as a means to increasing profitability. A combination of general and case history applications...
Analysis of Expanding the Wolf Creek Powerplant
The Nashville District, Corps of Engineers, is examining the feasibility of expanding the Wolf Creek powerplant to increase its peaking capability. The economic analysis of peaking expansions...
Application of Computer Aided Design and Analysis Tools for Upgrading Existing Power Plant Equipment
This paper presents examples where state-of-the-art computer aided design and analysis techniques have been applied to upgrade hydraulic performance and structural reliability of existing...
Synopsis: Ozark-Webbers Falls Turbine Repairs
The Ozark and Webbers Falls powerhouses were designed and constructed under the supervision of the U. S. Army Corps of Engineers and are located on the McClellan-Kerr Arkansas River Navigation...
Competitive Model Testing for Replacement Runners at the Wells Hydroelectric Project
The Wells Hydroelectric Project, located on the Columbia River, contains ten Kaplan-type turbines. The plant has been in commercial operation since January, 1969. The runners have a long...
Application of an Integrated Numerical System for the Modernization of Hydro Turbines
The modules of an integrated numerical system for the new design and replacement of hydro power plant components are described and some examples of application are shown. The main modules...
Rehabilitation of a Pump/Turbine
Between 1964 and 1968, eight 212 in pump discharge diameter Baldwin-Lima-Hamilton vertical pump/turbines with Westinghouse motor/generators were installed in Philadelphia Electric Company's...
Uprating Francis Turbines Provides Additional Energy
The use of existing powerhouse, penstocks, dams and unit configuration, all provide for a quick cost effective method to increase output from an existing turbine installation. This paper...
Uprating Hydro Turbines and Generators
Various engineering evaluations of the turbine and generator components are required when considering uprating units. Often, certain turbine and generator components have to be redesigned...
Assessment of Probable Fishery Impacts of Hydroelectric Development at Lock and Dam No. 26 (Replacement), Mississippi River
Early coordination with affected Federal and state agencies allowed completion of an Environmental Assessment for a hydroelectric plant proposed for Lock and Dam No. 26 (Replacement)....
Galt Energy's Inverted Siphon System
Galt Energy Systems' involvement with attempting to standardize the civil component began with studies at small remote sites in Northern Ontario. The system design evolved...
A New Generation of Standard Francis Spiral Turbines
A new generation of standardized Francis spiral case turbines has been developed by Voith. The high performance has been achieved through employment of the most recent hydraulic designs...