Alto Anchicaya Dam?Ten Years Performance
The general aspects of design and construction of the Alto Anchicaya Dam duilt during 1970 - 1974 in Colombia, South America are described. The paper refers to the performance of the structure...

Membrane Sealing of Rouchain Dam
A synthetic sealing membrane was used to prevent excessive leakage through the facing of an embankment dam. The works, which were completed rapidly and at low cost, enabled the reservoir...

Golillas Dam?Design, Construction and Performance
Golillas Dam is a concrete face, gravel fill dam, 125 m (410 ft) high built seven years ago that has had some difficulties during its initial operating years; due to the shape of the canyon,...

The Outardes 2 Concrete-Faced Rockfill Dam
The main dam of the Outardes 2 development consists of a rockfill embankment, built against an old water-retaining structure, and faced with an upstream concrete membrane. The interface...

Concrete Face Rockfill Dams of the Winneke Project
Two of the three dams forming the Winneke Reservoir, near Melbourne, Australia, are concrete face rockfill dams. A minor dam forming the sludge storage pond for the project's...

The R. D. Bailey Dam, a Concrete-Faced, Earth-Rockfill
A case history for the R. D. Bailey Dam, describing its comparatively unique design and construction considerations, and its operational performance since initial reservoir filling in...

Foz do Areia Dam?Design, Construction, and Behaviour
The 525 ft (160 m) high Foz do Areia dam in the Iguacu River, Parana, Brazil, built by 'Companhia Paranaense de Energia - COPEL', between 1975-1980, is part of...

Construction of Foz do Areia Dam
The methods and equipment for the construction of Foz do Areia Dam during 1976-1980 in Brazil are described. Special emphasis is given to the rockfill construction. Foz do Areia was the...

Mangrove Creek Dam: Use of Soft Rock for Rockfill
Mangrove Creek Dam is an 80 m high concrete faced rockfill dam (CFRD) completed in 1981. The embankment was constructed largely out of low strength sandstones and siltstones available...

Design and Performance of Shiroro Rockfill Dam
Shiroro Dam, constructed across the Kaduna River in Nigeria, is a rockfill dam with reinforced concrete facing. The dam was completed in late 1983, and reservoir impounding started in...

Fortuna Concrete Face Rockfill Dam
The Fortuna Dam is a 60 m high concrete face rockfill dam located in Panama, designed to be built in two stages. This paper describes the construction of the first stage dam, 60 m high,...

Design Features of Salvajina Dam
Salvajina dam is the second highest concrete face rockfill dam currently in service in the world. The characteristics of the foundation of the toe slab vary from fresh, sound and little...

Construction and Performance of Salvajina Dam
Salvajina Dam was constructed between July, 1982 and November, 1984. Relevant construction aspects are described, particularly those related with procedures and statistical data of the...

Boondooma Dam
Concrete faced rockfill construction was adopted for the 210 ft (64 m) high Boondooma Dam in Southern Queensland, Australia, after detailed comparison between concrete faced and earth...

Khao Laem?A Concrete Face Rockfill Dam on Karst
A continuously reinforced concrete faced rockfill dam has been successfully designed and constructed on a karstic limestone foundation in Central West Thailand. The dam is not in an earthquake...

Design and Construction of Terror Lake Dam
Terror Lake Dam is a central feature of the 189 million Terror Lake Hydroelectric Project, located on Kodiak Island Alaska. The dam is a 193-feet (59 m) high concrete-faced zoned rockfill...

Kotmale Dam and Observations on CFRD
A concrete faced rockfill dam was the type selected for the 300 ft (90 m) dam at Kotmale in Sri Lanka for reasons of economy and speed in construction. Standard design concepts were tailored...

Design of Concrete-Faced Rockfill Dams
Design principles adopted in 1966 by the Hydro-Electric Commission have been applied to nine concrete-faced rockfill dams and remain substantially unchanged. Experience shows that the...

Construction of Concrete Face Rockfill Dams
The Hydro-Electric Commission, Tasmania, Australia has been building concrete face rockfill dams since 1968. Eight dams from 26m to 110m high have been completed, and the highest at 122m...

Seismic Analysis of Concrete Face Rockfill Dams
In this article, the observed behavior of existing rockfill dams during earthquakes is compared with published data regarding the estimated seismic performance of several recently designed...

 

 

 

 