Public Involvement Strategies: A Case Study in Citizen Participation
Literally millions of dollars are wasted every year because authorized and funded water projects are stalled in court, hung up in administrative proceedings, or delayed while the project...

Planning for Small-Scale Hydroelectric Development: A State Response
A 'surplus' of power in the Pacific Northwest region of the country has brought with it a declining interest in the generation of new electrical energy supplies....

Determination of the Effects of Multiple Small-Scale Hydroelectric Projects on Resources in a California River Basin: A Matrix Approach
In 1983, Section 306 of the Energy and Water Appropriation Act required the FERC to conduct a comprehensive water resource analysis in the Upper San Joaquin River Basin, California. A...

Wilderness Hydrometeorological Study in the Colorado River Basin: A Case Study in Natural Resource Conflict Resolution
This paper describes the formation and progress of the Interagency Committee on Wilderness Hydrometeorological Data Collection (ICWHDC). It highlights how the ICWHDC is attempting to resolve...

Oxygenation of Releases from Richard B. Russell Dam
In July 1972, the Georgia Department of Natural Resources requested the formation of a technical committee to analyze the water quality matters relating to the Russell project. Studies...

U.S.-China's Cooperation in Unified Resource Development
This paper reports on activities between China and the United States involving exchange of technical expertise and project development. The paper focuses on how unified resource development...

Quantifying the Maximum Capability of Hydroplants
A procedure was developed to quantify the maximum hydropower capability. This procedure basically consists of two steps: dividing the total available water into weekday and weekend components;...

Water Availability for Energy Development in the Upper Colorado River Basin
The Bureau of Reclamation is investigating, for planning purposes through hydrologic determination, the total allowable depletion level in the Upper Colorado River Basin. The Colorado...

U.S./PRC Cooperation on the Three Gorge Project
The Three Gorge Project is the keystone project in developing and using the Yangtze River. It is located on the main stem of the Yangtze River, about 40 km upstream from the Gezhouba Project...

Transportation Liability and Risk Management
Risk management programs provide an excellent response to the increased exposure of all transportation agencies to tort liability claims. While some actions and responses require resources...

Some Questions on the Accuracy of Safety Effectiveness Evaluations
The generally positive benefits of safety improvements, and, in particular, upgraded traffic control devices, are well-established. More difficult is the explicit rank-ordering of traffic...

Business Planning and Project Implications
Frequent change and unfamiliar conditions in design and construction markets now force greater attention to business planning. New approaches are required to win and successfully complete...

Water Use Planning�Boston Harbor
This paper establishes a methodology for harbor planning based on comprehensively evaluating the water resource, categorizing the vessels which use the harbor, and prioritizing locational...

Tallying Water Resources Goals
Federal water resources planning philosophy has undergone a lengthy evolution with a number of refinements in the past decade to encompass environmental laws and the political philosophy...

Radium Removal from Groundwater Using Sorption to Filter Sand
The use of this novel process to remove sufficient radium from drinking water by filter sand has been demonstrated. A major potential advantage of this process is that a minimal capital...

Contaminated Well Field Study Case History: West Milford Township
The contaminated well field program initiated by the NJDEP has proven effective in enabling a rapid response to a wide variety of water supply and groundwater contamination problems as...

Design Considerations and Experiences with VOC Treatment Technologies
This paper presents a review of design considerations and experiences with packed column aeration for removal of volatile organic chemicals (VOC) from groundwater at various locations...

Ft. Lauderdale Wellfield Protection
Results of the study on groundwater contamination measurement and control are reported. The goal of this study was to ensure a safe and long-term supply of drinking water to the City of...

Evaluation of Landfill Leachate Recirculation
The effectiveness of leachate recycle as a leachate management technique has been evaluated at a landfill in central Pennsylvania where recirculation has been practiced for seven years....

Hydrogeologic Investigation of the Chillicothe, Ohio Landfill
A hydrogeologic investigation of a municipal waste landfill determined that the local surface and ground water are being polluted. Water quality monitoring and aerial photography were...

 

 

 

 

Return to search