The Sultan River Hydroelectric Project
It took almost 70 years and required over 100 separate local, state and federal permits, but in June 1984, development of the Sultan River was finally completed for the multi-purpose use...
Methodology for Optimization of Cascade Small Hydro
An accurate classification of small hydro sites is introduced. Class 'C' small hydro developments utilize favourable topographical and hydraulic gradients along...
Solar Ponds for Power and Water Quality Control
The status is provided on a solar pond test project in which the Bureau of Reclamation is involved in a cooperative effort with UTEP (The University of Texas at El Paso), Bruce Foods Corporation,...
Nanpil River Hydropower Project Pohnpei, Federated States of Micronesia
The Nanpil River Hydropower Project is a 1600 KW run-of-the-river hydropower project located on the tropical island of Pohnpei, Federated States of Micronesia. The hydropower project will...
Carmen-Smith Uprate & Modernization
The Carmen-Smith Powerhouse is located on the upper McKenzie River, 75 miles northeast of Eugene, Oregon. Carmen's two nearly identical 42. 1 MVA vertical hydroelectric turbine...
Analysis of Expanding the Wolf Creek Powerplant
The Nashville District, Corps of Engineers, is examining the feasibility of expanding the Wolf Creek powerplant to increase its peaking capability. The economic analysis of peaking expansions...
Renovation of the Shoshone Powerplant, Wyoming
Shoshone Powerplant and Buffalo Bill Dam are located on the Shoshone River approximately 5 miles (8. 1 km) west of Cody, Wyoming. The Powerplant was completed and the first two generating...
The Twlefth Street Project?Multiple Uses on the Falls of the James River
This paper is about a hydroelectric project that was not built. The project is located in Richmond, Virginia on the James River. Project civil works, water rights and adjacent land are...
Fishery Issues Slow Boardman River Redevelopment
At issue was the requirement of the Michigan Department of Natural Resources (MDNR) and the U. S. Fish and Wildlife Service to require the establishment of fish ladders at the hydro sites....
Small-Hydro Development and Public Decisionmaking
This paper is based on a larger study (Soden, 1985), and employs concepts distilled from public choice theory - an increasingly well-accepted approach to the study of public policy and...
Determination of the Effects of Multiple Small-Scale Hydroelectric Projects on Resources in a California River Basin: A Matrix Approach
In 1983, Section 306 of the Energy and Water Appropriation Act required the FERC to conduct a comprehensive water resource analysis in the Upper San Joaquin River Basin, California. A...
Wilderness Hydrometeorological Study in the Colorado River Basin: A Case Study in Natural Resource Conflict Resolution
This paper describes the formation and progress of the Interagency Committee on Wilderness Hydrometeorological Data Collection (ICWHDC). It highlights how the ICWHDC is attempting to resolve...
Study of River Stage Fluctuations Resulting from Possible Operations of the Susitna Hydroelectric Project
Operation of the project to follow load may result in discharge and river stage fluctuations which could affect habitats and fish food sources. Limitations on hourly, daily, and weekly...
Assessment of Probable Fishery Impacts of Hydroelectric Development at Lock and Dam No. 26 (Replacement), Mississippi River
Early coordination with affected Federal and state agencies allowed completion of an Environmental Assessment for a hydroelectric plant proposed for Lock and Dam No. 26 (Replacement)....
Salmon Restoration: Blessing, Bane or Boondoggle?
The 'strategic' plans for the Atlantic Salmon Restoration Program were examined to determine what the strategy of the U. S. Fish and Wildlife Service is for this...
U.S.-China's Cooperation in Unified Resource Development
This paper reports on activities between China and the United States involving exchange of technical expertise and project development. The paper focuses on how unified resource development...
HydroMAX; Computerized Hydropower Scheduling
The New England Power Exchange (NEPEX) is currently using the HydroMAX Program to schedule daily hydropower operations for the 17 stations in the 11,250 square mile Connecticut River Basin....
Modeling a Real-Time Reservoir Operation for Hydropower Resources Analysis
This paper deals with modeling the operation of two reservoirs in tandem in order to determine energy gain at the downstream plant due to the regulation provided by the upstream reservoir....
Water Availability for Energy Development in the Upper Colorado River Basin
The Bureau of Reclamation is investigating, for planning purposes through hydrologic determination, the total allowable depletion level in the Upper Colorado River Basin. The Colorado...
Simulation of River Ice Processes on Alaska's Susitna River
A numerical river ice model is applied to an 85-mile reach of Alaska's Susitna River immediately downstream of the proposed Susitna Hydroelectric Project. The model is designed...