Hydraulic Model Studies - Sidney A. Murray Jr., Hydroelectric Plant
The power plant is located at the Old River Control of the Lower Mississippi River (Louisiana). It consists of an intake channel about 5000 ft long, a power plant with eight bulb units...

Quick Response on the Mississippi
In November 1987, the Mississippi River broke through the foundation of the St. Anthony Fall's Lower Dam Hydropower Plant. The plant's owner, the Northern State...

Preventive Maintenance: Fixing What Ain't Broke
Municipalities are often caught in the cycle of built-neglect-rebuild. For bridges, the solution is preventive maintenance: keep the bridges clean and painted, and they'll...

Hot Mix Asphalt Utilization in Railway Trackbeds
Described herein are the rationales for, descriptions of and evaluations of hot-mix asphalt (HMA) trackbed rehabilitation and construction techniques recently utilized in various classes...

Sediment Transport Modeling
This is the Proceedings of the International Symposium on Sediment Transport Modeling, held in New Orleans, Louisiana, August, 1989. It reviews the state of the art and presents the latest...

Fast Track, Instant Track
There is a newly constructed railroad bridge over the Wilamette River in Portland, Oregon. The 499 ft. clear maritime channel allows the world's largest ships to navigate...

The Race for Smart Cars
Prendergast describes the technological elements involved in Intelligent Vehicle/Highway Systems (IVHS), current programs in Europe, Japan and the U.S. aimed at implementing IVHS systems,...

Screaming Structures
As any designer of roller coasters will tell you, civil engineering principles put the thrills and screams into roller coasters. There are two basic differences between roller coaster...

Metro Project Implementation?The Early Stages
Metro (the Municipality of Metropolitan Seattle) is a federation of governments in King County, Washington which is responsible for regional public transportation and waste water collection...

Getting the Most From Engineering Consultant
The Los Angeles County Transportation Commission ('LACTC') has embarked upon a 150 mile rail transit construction program within Los Angeles County. A program...

Specifications and Constructibility
The article discusses these and other aspects of the subject, including training programs for inspectors and project managers, research/development and pilot testing of new products, methods...

Utilization of Specifications
Project specifications need to be practical, enforceable, and above all must be clear and specific enough to enable any competent builder to understand them, bid on them and carry them...

The WMATA Resident Engineer and the METRO Construction Team
This paper discusses the organization, mission and functions of the Resident Engineer and the other construction elements of the Washington Metropolitan Area Transit Authority (WMATA)....

The Jet Set
The new maintenance hangar now nearing completion at Charlotte/Douglas International Airport has aluminum standing seam roofing. The unusual material was specified because every ounce...

Appropriate Design and Construction of Conduits for Small and Mini Hydropower
The success of smaller hydro schemes often lies in identifying feasible and economic waterway systems to develop relatively high heads between low intake weir and powerstation. This paper...

Rebuild of Ten Mile Intake Flume Structure for Electron Hydropower Project
In 1984 the Puget Sound Power and Light Company began a rebuild of what is popularly referred to as the 'world's crookedest railroad. ' The 'railroad'...

Landmarks in Civil Engineering
Historic American engineering projects sampled in this article represent those documented in Landmarks in Civil Engineering, by Daniel L. Schodek,...

Exploring Karst Terrain with Air Track Drilling
Pneumatic-powered track-mounted, percussion drills can be used to perform or augment geotechnical investigations in some karst settings. The air track drill is best suited to exploring...

Karstic Foundation Problems Sunny Point Railroad
Active limestone sinkholes have been causing problems and affecting the operation of the access railroad to the Military Ocean Terminal, Sunny Point, North Carolina (MOTSU) since 1962....

Accommodation of Large Trucks: Traffic Control Issues
The objective of this paper is to identify ways that large trucks can be accommodated safely and efficiently through traffic control. Traffic control is herein defined as encompassing...

 

 

 

 