New Concepts for Prelininary Hydropower Design
Hydropower generation on steep mountainous streams where storage is impractical can usually be made economical if: the flow duration curve shows sufficient energy available in the high...

Kinetic Hydro Energy Conversion System Study
In early studies conducted at New York University (NYU) at the request of New York Power Authority (NYPA) a number of conclusions were reached regarding the resource and the types of kinetic...

Solar Ponds for Power and Water Quality Control
The status is provided on a solar pond test project in which the Bureau of Reclamation is involved in a cooperative effort with UTEP (The University of Texas at El Paso), Bruce Foods Corporation,...

The PowerBarge?Portable Hydro for the Third World
The PowerBarge concept consists of a floating intake, siphon penstock, and floating generating station for use at new or existing low-head dams. Apart from access, mooring facilities,...

Blue Marsh?A Modular Hydroelectric Project
The Blue Marsh Hydroelectric Project will be the first complete application of concepts developed in several research studies of modular hydroelectric power plant components. The Department...

Development of the Standardized Francis Turbine
Initial machine selections to address higher head sites included small custom Francis turbines and standard pumps running in the turbine mode. As the former proved too costly and the latter...

Computer Aided Design of Small Hydro Turbine
The paper discusses a system for producing custom designed turbines which are attractive in price and delivery, retaining the advantages of customization. A computerized program is being...

Observations and Experiences of Bulb Turbines
This article gives a short historical review of the introduction, construction and development of bulb turbine plants in Sweden. The article relates some of the experiences of the designers,...

Optimization of Low Head Hydro Equipment
In this paper, we will limit our purpose to the presentation of the different types of turbines that CE/Neyrpic proposes for low head power plants, for run of the river operations. We...

Small Kaplan Versus Tubular and Francis Turbines
Mossefossen Power Plant is situated in the centre of the small town Moss in the southern part of Norway. Water flows from an existing dam through a 9 m**2, 175m long tunnel to the powerhouse...

Design Criteria for Generators in Low-Head Hydro-Power Plants
Principal characteristics and design features of such generators are discussed and options and preferences in their selection mentioned. Effects on inertia constant, efficiency, reactive...

Index Testing?Relative Turbine Performance
The Index method of testing hydraulic turbines consists of making a test in which the value of power output and head are measured and in which the quantities of water and velocity head...

Interchangeable Runners Can Increase Energy Output
Interchangeable turbine runners can be used to increase energy generation at some hydroelectric power sites. Two different turbine runners can be designed for different design heads or...

Analyses and Field Tests for Hydraulic Transients Sultan Hydroelectric Project
Two in-line Francis units with their long discharge conduit and bypass valves present some unique problems in controlling hydraulic transients in this system. The problems were compounded...

Advance Prediction of Flow-Induced Variations
Frequency analysis of hydraulic vibrations has been applied using a transfer matrix and impedance method. The computer program is given for the self-excited and forced vibrations, together...

Leakage from Pressure Tunnels and Shafts
Several issues related to leakage from unlined pressure tunnels and shafts are reviewed and discussed. They include confinement, or cover requirements relative to hydraulic jacking of...

Analysis and Testing of Transient Pressures at Camp Far West Hydroelectric Project
The objective of this paper is to present a comparative discussion of the results of theoretical analysis of transient pressures and of field tests performed on the Camp Far West Hydroelectric...

Design of the Tunnel System for the Terror Lake Hydroelectric Project
The Terror Lake Hydroelectric Project, Kodiak, Alaska, contains a 5-mile-long (8. 1 Km) power tunnel with supplementary stream diversions entering it by two shafts along its alignment....

Hoover Dam Plus Fifty Years Equals El Cajon Dam
The completion of El Cajon arch dam on the fiftieth anniversary of the completion of Hoover Dam has given the opportunity to compare design and construction of two concrete arch dams constructed...

Sherman Island Hydro Cofferdam
The design and construction of an eight hundred foot long by sixty-five foot high cofferdam is discussed. The cofferdam was located to permit major renovation of the existing downstream...

 

 

 

 

Return to search